11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

71. CONTRACTOR'S LABOURERS TO LEAVE SITE ON COMPLETION OF THE WORK:The Contractor's labourers must leave the loc<strong>at</strong>ion of the project site/township after thework is tapered/completed to avoid cre<strong>at</strong>ion of a Slum in the areas adjoining theproject/township.72. TEMPORARY WORKS: All Temporary and ancillary works including enabling worksconnected with the work shall be responsibility of the Contractor and the price quotedby them <strong>for</strong> erection shall be deemed to have included the cost of such works, whichshall be removed by the Contractor <strong>at</strong> his cost, immedi<strong>at</strong>ely after completion of hiswork.73. MAKE OF EQUIPMENTS/COMPONENTS: Contractor shall procure and supply theitems covered in their scope from the approved vendors. Wherever an item is specifiedor described by a particular brand name, manufacturer or vendor, the specific itemmentioned shall be <strong>for</strong> establishing type, function and quality desired. Othermanufacturer's products will be considered, provided sufficient in<strong>for</strong>m<strong>at</strong>ion arefurnished to the Employer to assess the products proposed as equivalent andacceptable. Contractor shall take prior approval from Engineer-in-Charge <strong>for</strong> procuringsuch items which are not covered under approved vendor list.74. QUALITY ASSURANCE SYSTEM.- As applicable The Contractor shall include in hisoffer the Quality Assurance Programme containing the overall quality management andprocedures which is required to be adhered to during the execution of contract. Afterthe award of the contract, detailed quality assurance programme to be followed <strong>for</strong> theexecution of contract under various divisions of works will be mutually discussed andagreed to. The Contractor shall establish document and maintain an effective qualityassurance system as outlined in recognised codes.Quality Assurance System plans/procedures of the Contractor shall be furnished in the<strong>for</strong>m of a QA manual. This document should cover details of the personnel responsible<strong>for</strong> the quality assurance. , plans or procedures to be followed <strong>for</strong> quality control inrespect of Design, Engineering, Procurement, Supply, Install<strong>at</strong>ion, Testing andCommissioning. The quality assurance system should indic<strong>at</strong>e organiz<strong>at</strong>ional approach<strong>for</strong> quality control and quality assurance of the construction activities <strong>at</strong> all stages ofwork <strong>at</strong> site as well as <strong>at</strong> manufacturer’s works and desp<strong>at</strong>ch of m<strong>at</strong>erials.The Owner/or their represent<strong>at</strong>ive shall reserve the right to inspect/witness review anyor all stages of work <strong>at</strong> shop/site as deemed necessary <strong>for</strong> quality assurance.The Contractor has to ensure the deployment of quality Assurance and Quality controlEngineer(S) depending upon the quantum of work. This QA/QC group shall be fullyresponsible to carry out the work as per standards and all code requirements. In caseEngineer-in-Charge feels th<strong>at</strong> contractor’s QA/QC Engineer(S) are incompetent orinsufficient contractor has to deploy other experienced Engineer(s) as per siterequirement and to the full s<strong>at</strong>isfaction of Engineer-In-Charge.In case contractor fails to follow the instructions of Engineer-in-charge with respect toabove clauses, next payment due to him shall not be released unless and until hecomplies with the instructions to the full s<strong>at</strong>isfaction of Engineer-in-charge.75. TEST AND INSPECTION OF WORKS: The Contractor shall carry out the various testsas per direction of Engineer-in-Charge either on field or outside/labor<strong>at</strong>ories concerningthe execution of work and supply of the m<strong>at</strong>erial by contractor. All the expenses shallbe borne by the contractor and shall be considered as included in the r<strong>at</strong>es quoted. Theinspection shall be done by the following agencies:Represent<strong>at</strong>ive deputed by Engineer-in-chargeRepresent<strong>at</strong>ive deputed by St<strong>at</strong>utory AuthorityContractor shall give prior notice sufficiently ahead of time to the Engineer-inchargeand also to the authorities to conduct inspection/to witness such tests.The work is subject to inspection <strong>at</strong> all times by the Engineer-in-Charge. The Contractorshall carry out all instructions given during inspection and shall ensure th<strong>at</strong> the work isbeing carried out according to the technical specific<strong>at</strong>ions of this tender, the technicalPage 20 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!