11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.0 LOCATION AND ACCESS OF SITEThe work site is loc<strong>at</strong>ed within OMPL petrochemical plant complex; <strong>Mangalore</strong> /Refer SCC3. SCOPE OF WORKThe scope of the work covered in this tender shall be as specified in the various TechnicalSpecific<strong>at</strong>ions/SCC. It is, however, explicitly understood and confirmed by the CONTRACTORth<strong>at</strong> the scope as described in the TENDER DOCUMENT is not limiting, in so far as theresponsibilities of the Contractor shall include, inter-alia, carrying out any and all works andproviding any and all facilities those are required in accomplishing the task, complying fully withall requirements as are envisaged of it, complete in all respects and s<strong>at</strong>isfying all per<strong>for</strong>manceand guarantee requirement st<strong>at</strong>ed or implied <strong>for</strong>m the contents of the BIDDING documents.4.SCOPE OF JOB/WORK/SERVICES/BOQ/PRICE BIDPlease refer to SCC <strong>at</strong> Section III & IV <strong>for</strong> Tech specific<strong>at</strong>ions/conditions/Price bid.6.UNDERGROUND AND OVERHEAD STRUCTURESThe Contractor will familiarise himself with and obtain in<strong>for</strong>m<strong>at</strong>ion and details from the Ownerin respect of all existing structures, overhead lines, existing pipelines and utilities existing <strong>at</strong>the job site be<strong>for</strong>e commencing work. The Contractor shall execute the work in such a mannerth<strong>at</strong> the said structures, utilities, pipelines etc are not disturbed or damaged and shallindemnify and keep indemnified the Owner from and against any destruction thereof ordamages thereto.<strong>7.</strong> CO-ORDINATION WITH OTHER AGENCIESThe work shall be carried out in such manner th<strong>at</strong> the work of other agencies oper<strong>at</strong>ing <strong>at</strong>the site is not hampered due to any action of the Contractor. The Contractor will beresponsible <strong>for</strong> ensuring proper co-ordin<strong>at</strong>ion with other agencies. In the event of any disputebetween the Contractor and any other agency employed <strong>at</strong> the job site arising out of orrel<strong>at</strong>ed to the per<strong>for</strong>mance of the work, the decision of the Engineer-in-charge shall be finaland binding on the Contractor.8. LABOUR LAWSThe Contractor shall obtain necessary licence from the Licensing Authority under the ContractLabour (Regul<strong>at</strong>ion & Abolition) Act, 1970 and the Central Rules framed thereunder andproduce the same to the Engineer-in-charge be<strong>for</strong>e start of work.The Contractor shall not undertake or execute or permit any other agency or sub-contractor toundertake or execute any work on the contractor's behalf through contract labour except underand in accordance with the licence issued in th<strong>at</strong> behalf by the Licensing Officer or otherauthority prescribed under the Factories Act or the Contract labour (Regul<strong>at</strong>ion & Abolition) Act-1970 or their applicable law rule or regul<strong>at</strong>ion if applicable.The provision of EPF & MP Act. 1952 and the Rules/Scheme thereunder shall be applicable to theContractor and the employees engaged by him <strong>for</strong> the work. The Contractor shall furnish thecode number allotted by the RPFC Authority, to the Engineer-in-Charge be<strong>for</strong>e commencing thework.The Contractor shall be exclusively responsible <strong>for</strong> any delay in commencing the work on accountof delay in obtaining a license under clause 6.1 above or in obtaining the code number underClause 6.3 above and the same shall not constitute a ground <strong>for</strong> extension of time <strong>for</strong> anypurpose.The Contractor shall en<strong>for</strong>ce the provisions of ESI Act and Scheme framed thereunder withregard to all his employees involved in the per<strong>for</strong>mance of the Contract and shall deductemployee's contribution from the wages of each of the employees and shall deposit the samePage 29 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!