11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

89. The Contractor shall submit the Bio-d<strong>at</strong>a of all the employees including the Supervisor tothe Engineer-in-charge be<strong>for</strong>e taking up the job. Only those employees who’s Bio-d<strong>at</strong>aare approved shall be allowed to work inside the Petrochemical plant Complex. Thepersonnel engaged by the Contractor shall maintain good conduct and disciplinecommensur<strong>at</strong>e with <strong>Industrial</strong> standard. If in the opinion of the Engineer-in-charge anyof the personnel have not maintained good conduct and discipline, the Contractor shallremove such personnel immedi<strong>at</strong>ely from OMPL premises and provide altern<strong>at</strong>epersonnel.90. The Contractor shall make his own transport arrangements/stay and food <strong>for</strong> theirpersonnel during normal duties as well as extended duties and no company transportshall be provided to the Contractor.91. The Contractor shall make himself fully conversant with the loc<strong>at</strong>ions and the type of jobto be carried out.92. Housekeeping of the workplace shall be done strictly by the Contractor on daily basis oras required by the Engineer-in-charge. Contractor to collect all debris/ scrap and dump<strong>at</strong> design<strong>at</strong>ed Scrap Yard within the project site.93. The Contractor shall prepare plan <strong>for</strong> executions of jobs and get the same approved bythe Engineer-in-charge. The Contractor shall submit progress report <strong>at</strong> specifiedintervals and shall be responsible to ensure the specified progress.94. The Contractor shall ensure th<strong>at</strong> day’s work planned by OMPL Engineer-in-charge iscompleted on the same day. In case of backlog, the Contractor to increase themanpower or equipment resources to ensure timely completion of the job.95. The Contractor shall ensure good workman-ship in all the jobs carried out. Any defectsfound in the completed jobs shall be rectified by the Contractor free of charge to thes<strong>at</strong>isfaction of the Engineer-in-charge.96. If <strong>at</strong> any stage of the work, the progress of the Job is found uns<strong>at</strong>isfactory, OMPLreserves the right to carry out the remaining portion of the Job by hiring the <strong>services</strong> ofthe other agencies and charge the cost of such <strong>services</strong> to Contractor’s account. In caseof any disputes OOMPL’s decision will be final & binding.9<strong>7.</strong> The work to be carried out in a manner so as not to cause damage to the surroundings.Damage if caused during carrying out the Job has to be made good by the Contractor <strong>at</strong>no extra cost to OMPL.98. No Extra Bill or Claim <strong>for</strong> extra work or supply of m<strong>at</strong>erial will be entertained unlessundertaking of such extra work/supply of m<strong>at</strong>erial has been authorised by OMPL inwriting.99. OMPL reserves the right to termin<strong>at</strong>e the Contract without assigning any reason <strong>at</strong> anytime during the validity of the Contract period.100. Monthly RA Bills shall be submitted to Accounts Dept. on any working day duly certifiedby the Engineer-in-charge after completion of work.101. OMPL reserves the right to award the job in full or in any combin<strong>at</strong>ion of the items asfelt convenient.SPECIAL SAFETY PRECAUTIONS TO BE TAKEN BY CONTRACTORS WORKING IN THEPROJECT SITE102. Smoking /use of cell phones inside the project site is strictly prohibited. Contractorshall ensure th<strong>at</strong> all workmen employed do not smoke inside the petrochemical plantpremises. Workmen shall not strike any arc or light naked flame without valid permit.They will not be permitted to bring in any flammable m<strong>at</strong>erials or m<strong>at</strong>ches whileentering the petrochemical plant premises.103. Contractor shall ensure th<strong>at</strong> valid permits are available <strong>for</strong> doing the work. Contractorshall not start or continue any type of work without the valid permit.Page 23 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!