11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A self certified copy to this effect/ or an affidavit th<strong>at</strong> the vendor is not black listed by abovementioned Agencies is required to be produced, if called <strong>for</strong> by OMPL, in the event of award ofLOA/work order.16. Originals of the qualifying documents should be produced as and when asked <strong>for</strong>verific<strong>at</strong>ion, and failure to produce such Original document/s <strong>at</strong> specified d<strong>at</strong>e, timeand place would mean rejection of tender <strong>for</strong> further evalu<strong>at</strong>ion.1<strong>7.</strong> OMPL reserves the right to accept or reject any or all tenders and <strong>at</strong> any stage of thetender evalu<strong>at</strong>ion process <strong>at</strong> the company's sole discretion and without assigning any reasonthereof.Other Conditions of the Contract (As applicable)1.0 General1.1 This shall be read in conjunction with the General Conditions of Contract, Scope of workspecific<strong>at</strong>ions of work, drawings and any other document <strong>for</strong>ming part of this contractwherever the context so requires.Notwithstanding the sub divisions of the document into these separ<strong>at</strong>e sections andvolumes every part of each shall be deemed to be supplementary to and complementaryof every other part and shall be read with and into the contract so far as it may bepracticable to do so.Where any portion of the Special Conditions of Contract (SCC) is repugnant to or <strong>at</strong>variance with any provisions of the General Conditions of Contract them unless adifferent intention appears. the provision of the Special Conditions of Contract shall bedeemed to override the provisions of the General Conditions of Contract only to theextent such repugnancies or vari<strong>at</strong>ions in the Special Conditions of Contract as notpossible of being reconciled with the provisions of General Conditions of Contract.Wherever it is st<strong>at</strong>ed any where in this tender document th<strong>at</strong> such and such a supply isto be effected or such and such a work is to be carried out, it shall be understood th<strong>at</strong>the same shall be effected/carried out by the contractor <strong>at</strong> his own cost, unless adifferent intention is specifically and expressly st<strong>at</strong>ed herein or otherwise explicit fromthe context.1.2 The m<strong>at</strong>erials, design and workmanship shall s<strong>at</strong>isfy the relevant Indian Standards, theTechnical Specific<strong>at</strong>ions contained herein and codes referred to. Where the jobspecific<strong>at</strong>ions stipul<strong>at</strong>e requirements in addition to those job contained in the standardcodes and specific<strong>at</strong>ions, these additional requirements shall also be s<strong>at</strong>isfied.1.3 In case of an irreconcilable conflict between Indian or other applicable standards.General Conditions of Contract, Special Conditions of Contact, Specific<strong>at</strong>ions, Drawingsand/or Schedule of R<strong>at</strong>es, the following shall prevail to the extent of such irreconcilableconflict in order of precedence.1.4 It will be the Contractor's responsibility to bring to the notice of Engineer-in-charge anyirreconcilable conflict in the Contract documents be<strong>for</strong>e starting the work(s) or markingthe supply with reference to which the conflict exists.1.5 In the absence of any Specific<strong>at</strong>ions covering any m<strong>at</strong>erial, design or work(s) the sameshall be per<strong>for</strong>med/supplied/executed in accordance with standard engineering practiceas per the instructions/directions of the Engineer-in-charge, which will be binding on theContractor.Page 28 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!