11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

documents and the relevant codes of practice furnished to him during the per<strong>for</strong>manceof the work.The Contractor shall provide <strong>for</strong> purpose of inspection access ladders, lighting equipment<strong>for</strong> testing and necessary instruments etc. <strong>at</strong> his own cost including Low Voltage Lightingequipments <strong>for</strong> tray fixing and inspection work.Compressed air <strong>for</strong> carrying out works shall be arranged by the contractor <strong>at</strong> his owncost. Any work not con<strong>for</strong>ming to the execution drawings, specific<strong>at</strong>ions or codes shallbe rejected <strong>for</strong>thwith and the Contractor shall carryout the rectific<strong>at</strong>ions <strong>at</strong> his own cost.All results of inspection and tests will be recorded in the inspection reports, Per<strong>for</strong>ma ofwhich will be approved by the Engineer-in-Charge. These reports shall <strong>for</strong>m part of thecompletion documents.For m<strong>at</strong>erials supplied by Owner, contractor shall carryout the tests, if required by theEngineer-in-charge and the cost of such tests shall be reimbursed by the Owner <strong>at</strong>actual to the Contractor or production of documentary evidence.Inspection and acceptance of the work by the Engineer-in-charge shall not relieve thecontractor from any of his responsibilities under this contract.76. LAND FOR RESIDENTIAL ACCOMMODATION: Contractor shall arrange land <strong>for</strong>residential accommod<strong>at</strong>ion <strong>for</strong> his staff and workers <strong>at</strong> his own cost and the quoted priceshall be deemed to include the same.7<strong>7.</strong> FUEL REQUIREMENT OF WORKERS/TRANSPORT: Contractor shall be responsible toarrange <strong>at</strong> his own cost <strong>for</strong> the fuel requirement of his workers and staff, cutting of treesetc. shall not be permitted <strong>for</strong> his purpose. To and fro from place of residence are alsoincluded in Price.78. REGISTRATION UNDER STATE GOVT. SALES TAX ACT/Service tax etc: Attestedcopy of certific<strong>at</strong>e of registr<strong>at</strong>ion under St<strong>at</strong>e Govt, sales Tax Act in the Per<strong>for</strong>maprescribed by the St<strong>at</strong>e Govt. should accompany the tender. The registr<strong>at</strong>ion underSales Tax Act should be in the name of the FIRM/INDIVIDUAL quoting <strong>for</strong> the work. Inthe absence of the above registr<strong>at</strong>ion, tender may not be awarded the work tendered <strong>for</strong>in the light of St<strong>at</strong>e Government directive/instruction. Tenderer shall undertake toregister as per provision of st<strong>at</strong>ues.79. CONSTRUCTION EQUIPMENT: The Contractor shall without prejudice to his overallresponsibility to execute and complete the work as per specific<strong>at</strong>ions and TimeSchedule, progressively deploy adequ<strong>at</strong>e equipments and tools and tackles and augmentthe same as decided by the Engineer-in-Charge depending on the exigencies of the workso as to suit the construction schedule. The renderer shall submit a list of constructionequipments he proposes to deploy <strong>for</strong> the subject work along with deployment schedule.No construction equipment shall be supplied by the Owner unless, otherwise specified.Tenderer to ensure deployment of suitable cranes/required equipment and take allsafety precautions during execution of work80. SITE ORGANISATION: The renderer shall submit the details of organis<strong>at</strong>ion proposedby him <strong>at</strong> site of work <strong>for</strong> the implement<strong>at</strong>ion of the works under the contract, togetherwith bio-d<strong>at</strong>a of the key personnel. The contractor shall however without prejudice tohis overall responsibility of execute and complete the works as per specific<strong>at</strong>ions andtime schedule progressively deploy adequ<strong>at</strong>e qualified and experienced personneltogether with skilled/unskilled manpower and augment the same as decided byEngineer-in- Charge depending on the exigencies of work to suit the constructionschedule without any additional cost to owner.81. PROVIDENT FUND: The Contractor should strictly comply with the provision of theEmployees Provident Fund Act. It is to be noted th<strong>at</strong> the subject contract would beawarded only to those agencies who have fulfilled the following requirements:Obtained licence under Contract Labour (Abolition and Regul<strong>at</strong>ion) Act 1970P.F. Registr<strong>at</strong>ion Number allotted to them by RPFC.The agencies should promptly deposit P.F. deduction of the eligible contract employeesplus the employer’s contribution to the RPF. For this purpose agency must submit aPage 21 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!