11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

employed by the contractor are required to comply with/maintain the following undercontract labour (regul<strong>at</strong>ion and abolition) act and also make it available <strong>for</strong> the inspectionby GM (P &A).Workmen registerAttendance registerWage register (payment to be made strictly as per minimum wages act)Work commencement certific<strong>at</strong>e from labour commissioner and labour license if requiredInsurance cover towards temporary disablement and permanent disablement <strong>for</strong> theworkmenPF Contribution -As per PF act the contractor has to obtain separ<strong>at</strong>e code <strong>for</strong> the PF oftheir employee from the PF commissioner/OMPL. Details of payment of PF <strong>for</strong> the wagesdisbursed by the contractor to the workmen shall be submitted to GM (P & A)periodically.d) The contractor should give an Undertaking th<strong>at</strong> he has gone through all terms andconditions of OMPL General Conditions of Contract and all terms and conditions areagreeable to them.e) Contractor shall ensure strictly all Safety Precautions to be taken in an Oper<strong>at</strong>ingPetrochemical plant. “Special safety precautions to be taken by the contractors working inoper<strong>at</strong>ing petrochemical plant” is ro be taken from Engineer Incharge.f) Contractor shall ensure th<strong>at</strong> all workmen entering petrochemical plant premises areprovided with valid photo g<strong>at</strong>e passes and to be produced on demand by each workman.g) The Contractor shall submit the Bio-d<strong>at</strong>a of all the employees including the Supervisor tothe Engineer-in-charge be<strong>for</strong>e taking up the job. Only those employees whose Bio-d<strong>at</strong>a areapproved shall be allowed to work inside the Petrochemical plant Complex. The personnelengaged by the Contractor shall maintain good conduct and discipline commensur<strong>at</strong>e with<strong>Industrial</strong> standard. If in the opinion of the Engineer-in-charge any of the personnel havenot maintained good conduct and discipline, the Contractor shall remove such personnelimmedi<strong>at</strong>ely from OMPL premises and provide altern<strong>at</strong>e personnel.h) The Contractor shall make his own transport arrangements/stay and food <strong>for</strong> theirpersonnel during normal duties as well as extended duties and no company transport shallbe provided to the Contractor.i) The Contractor shall make himself fully conversant with the loc<strong>at</strong>ions and the type of job tobe carried out.j) House keeping of the workplace shall be done strictly by the Contractor on daily basis or asrequired by the Engineer-in-charge. Contractor to collect all debris/ scrap and dump <strong>at</strong>design<strong>at</strong>ed Scrap Yard within the Petrochemical plant.k) The Contractor shall prepare plan <strong>for</strong> executions of jobs and get the same approved by theEngineer-in-charge. The Contractor shall submit progress report <strong>at</strong> specified intervals andshall be responsible to ensure the specified progress.l) The Contractor shall ensure th<strong>at</strong> day’s work planned by OMPL Engineer-in-charge iscompleted on the same day. In case of backlog, the Contractor to increase the manpower orequipment resources to ensure timely completion of the job.m) The Contractor shall ensure good workman-ship in all the jobs carried out. Any defectsfound in the completed jobs shall be rectified by the Contractor free of charge to thes<strong>at</strong>isfaction of the Engineer-in-charge.n) If <strong>at</strong> any stage of the work, the progress of the Job is found uns<strong>at</strong>isfactory, OMPL reservesthe right to carry out the remaining portion of the Job by hiring the <strong>services</strong> of the otheragencies and charge the cost of such <strong>services</strong> to Contractor’s account. In case of anydisputes OMPL’s decision will be final & binding.o) The work to be carried out in a manner so as not to cause damage to the surroundings.Damage if caused during carrying out the Job has to be made good by the Contractor <strong>at</strong> noextra cost to OMPL.p) No Extra Bill or Claim <strong>for</strong> extra work or supply of m<strong>at</strong>erial will be entertained unlessundertaking of such extra work/supply of m<strong>at</strong>erial has been authorised by OMPL in writing.Page 36 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!