11.07.2015 Views

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

7. Providing services for Industrial Canteen at ONGC Mangalore ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Other insurance which shall be necessary or which the CONTRACTOR deems necessary<strong>for</strong> proper per<strong>for</strong>mance of the WORKS e.g. Overseas (and/or Domestic) Travellers’ accident Insurance. Burglary Insurance All Risks marine cargo Insurance <strong>for</strong> the CONTRACTOR's CONSTRUCTION EQUIPMENT,tools and machinery, and <strong>for</strong> equipment and m<strong>at</strong>erials th<strong>at</strong> the CONTRACTOR'sTEMPORARY WORKS and th<strong>at</strong> the CONTRACTOR under the CONTRACT may supply <strong>for</strong>the WORKS and/or the PERMANENT WORK and Fidelity Guarantee InsuranceThe CONTRACTOR agree th<strong>at</strong> the provisions of this Clause shall to the extent asappropri<strong>at</strong>e, be apply all the contracts th<strong>at</strong> may <strong>for</strong> the WORKS be entered into by andbetween the CONTRACTOR and the respective SUBCONTRACTORs and unless theCONTRACTOR furnished insurance called <strong>for</strong> by the CONTRACT are good also <strong>for</strong> theSUBCONTRACTORs their properties and/or their liabilities in connection with the WORKSthe CONTRACTOR shall include in such contracts as a<strong>for</strong>ementioned the requirements<strong>for</strong> insurance con<strong>for</strong>ming to this clause.Inclusion of such insurance requirements in such contracts as a<strong>for</strong>ementioned however,shall not release the CONTRACTOR from any of his responsibilities and liabilities under theCONTRACT.2<strong>7.</strong> RECOVERY OF SUMS DUEWhenever any claim against the CONTRACTOR <strong>for</strong> payment of a sum of money arises out of orunder the contract, the Owner shall be entitled to recover such sums from any sum then due orwhich <strong>at</strong> any time thereafter may become due from the contractor under this or any othercontract with the Owner and should this sum be not sufficient to cover the recoverable amountthe Vendor shall pay to the Owner on demand the balance remaining due.28. DIFFERENCE IN MEANINGS/TERMS.In case of any difference of any of the terms and conditions either in the meaning orunderstanding or contradictory terms or conditions <strong>at</strong> different places/portions in thisdocument, the more stricter terms favouring OMPL will apply. The bidder shall also seekclarific<strong>at</strong>ions on such issues from OMPL be<strong>for</strong>e submission of the quotes.29. The contractor shall ensure <strong>at</strong> the time of submitting their final bills to the EIC, th<strong>at</strong> it isaccompanied by a NOC from Security Dept., OMPL, <strong>for</strong> having surrendered all Photo passes andBio-Metric cards issued by OMPL. If any Pass and Bio-Metric Cards are not surrendered evenafter the completion of job / contract, the contractors are liable to pay a fine of Rs.100/- <strong>for</strong>every un-surrendered pass and Rs.55/- <strong>for</strong> every Bio-Metric card (These fine amounts aresubject to revision by Security Dept., OMPL, from time to time.30. The tender terms/ conditions as per SCC (Special conditions of the contract) supersedes allsimilar terms prescribed under GCC./ all Other Conditions of Contract (OCC).Other Conditions of the Contract (Continued)1. St<strong>at</strong>utory Requirements/ Safety rel<strong>at</strong>ed aspects- (as applicable).a) This shall be read in conjunction with the OMPL General Conditions of Contract, SpecialSafety Precautions to be taken by the Contractors working in Hydrocarbon Industry ,Specific<strong>at</strong>ion of Work, Drawing or any other document <strong>for</strong>ming part of this contractwherever the context so requires.b) Contractor shall be responsible <strong>for</strong> the safety and health of all his employees.c) All Liabilities under IE rules 1956/labour laws, insurance on account of this contract <strong>for</strong>personnel/labour shall be done by the contractor. Engineer In-charge in co-ordin<strong>at</strong>ion withP&A dept will be ensuring th<strong>at</strong> all these st<strong>at</strong>utory requirements pertaining to labour andsafety is complied by the Contractor during the execution of the said contract. WorkmenPage 35 of 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!