11.07.2015 Views

SmartSensor HD - Interprovincial Traffic Services

SmartSensor HD - Interprovincial Traffic Services

SmartSensor HD - Interprovincial Traffic Services

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

24 CHAPTER 2 • CONNECTING POWER AND SURGEFigure 2.4 – Earth Ground ConnectionsInstalling the Power PlantProvide power to your installation using the Click power plant. This set of modules includesthe following:˽˽˽˽˽˽Click 201/202 AC to DC converterClick 210 circuit breaker and switchClick 230 AC surge moduleA Click 201 provides 1 A of power and is capable of powering a single sensor, while a Click202 provides 2 A and can power two sensors. (There is also a Click 204 which provides 4 Aof power, but that will usually not be necessary in an installation such as the one outlinedbelow.) The Click 230 helps limit current surges on the power lines; the Click 210 interruptspower during overload conditions and provides a convenient way to turn power onand off.The power plant will either be in a pole-mount box or in a main traffic cabinet. If it’s in atraffic cabinet, the power will be sent to the pole via an underground cable run. How to installthe power plant and then wire to a Click 200 will be covered in the rest of this section.It should be noted that if you have ordered a Wavetronix preassembled cabinet, all of thiswiring and installation will already be done.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!