11.07.2015 Views

Annual Report 2003-2004

Annual Report 2003-2004

Annual Report 2003-2004

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power Systems Control & Dispatching Research CenterNRIProject Title:Design of West Regional Dispatching System (WRDC)Department: Dispatching & Telemetery Project Manager: M. SoleymanifarEmployer: Gharb Regional Electric Co. Project Code: PDIBR02Project Staff: S. Farzalizadeh, F. Asadpour, M. Baghkhani, M. Kavousian,M. Enayati, A. Tavakkoli, K. Farahani, M. BigdeliSummary:The purpose of this project was design of regional dispatching system for GharbRegional Electric Company including technical specification and tender document forWRDC and associated 46 substations.Project Results: Designing interface system for 46 substation Preparing tender document for above interface system and evaluation of proposals Designing WRDC system including control center and 46 RTUs Preparing tender document for WRDC system and evaluation of proposalProject Documentation:- Dispatching & Telemetery Department; Design of SCADA interface system for 46substations; Power Systems Control & Dispatching Research Center; NRI.- Dispatching & Telemetery Department; Interface condition for 46 substation;Power Systems Control & Dispatching Research Center; NRI.91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!