12.07.2015 Views

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GV90+ gas-fired water boiler — <strong>Boiler</strong> <strong>Manual</strong>Prepare the boiler (continued)Perform hydrostatic pressure testPressure test boiler before attaching water or gas piping (except asnoted below) or electrical supply. Remove jacket top panel beforeproceeding.Figure 10 Piping connections for hydrostatic testUse two wrenches when tightening water piping atboiler, using one of the wrenches to prevent the boilerinterior piping from turning. Failure to support the boilerpiping connections to prevent them from turning couldcause damage to boiler components.Prepare boiler for test — see Figure 10Step 1 Connect a hose from water supply to fill and drain boilerfor hydrostatic test. Hose is not included with boiler.Step 2Step 3Step 4Step 5Step 6Connect hose to boiler drain valve. Make sure hose canalso be used to drain boiler after test.Remove 1" nipple, 1" tee, bushing and pressure/temperaturegauge from accessory bag. Pipe to boiler supply connectionas shown. Use pipe dope sparingly.Connect a nipple and shutoff valve to system supplyconnection on the 1" tee. This valve will be used to bleedair during the fill. Valve and nipple are not included withboiler.Connect a nipple and shutoff valve to system returnconnection at circulator flange. This valve will be used tobleed air during the fill. Valve and nipple are not includedwith boiler.Install a ¾" pipe plug in the relief valve opening, top ofthe rear boiler section, as shown. Plug is not included withboiler.Fill and pressure test1. Connect fill water supply through drain valve, item 2.2. Fill boiler with water (be sure bleed valves at 4 and 5 are open).3. When water flows from bleed valves, shut off water at drainvalve.4. Close bleed valves.5. Slowly reopen drain valve (item 2) until test pressure of 45 PSIG(or 1.5 times boiler relief valve setting — NEVER MORE than75 PSIG) is reached on the pressure gauge.6. Test at this pressure for no more than 10 minutes.Do not leave boiler unattended. A cold water fill couldexpand and cause excessive pressure, resulting in severepersonal injury, death or substantial property damage.7. Make sure constant gauge pressure has been maintained throughouttest. Check for leaks. Repair if found.Leaks must be repaired at once. Failure to do so can damageboiler, resulting in substantial property damage.Do not use petroleum-based cleaning or sealing compoundsin boiler system. Severe damage to boiler willoccur, resulting in substantial property damage.Drain and remove fittings1. Disconnect fill water hose from water source.2. Drain boiler at drain valve or out hose, whichever providesbest access to drain. Close drain valve and removehose after draining.3. Remove nipples and valves at 4 and 5 unless they willremain for use in the system piping.4. Remove plug (item 6) from relief valve tapping.Part number 550-142-054/1211 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!