12.07.2015 Views

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GV90+ gas-fired water boiler — <strong>Boiler</strong> <strong>Manual</strong>DIRECT VENT — Vertical with 3” concentric (continued)Mount concentric termination1. Mount the termination as shown in Figure 57, page 46.2. Support the concentric vent/air termination at the roof penetrationas shown in Figure 57.• The supports/bracing used must support the termination assemblyto prevent vertical slippage or sideways movement.• The clamps used on the outside of the termination pipe mustnot cut into the pipe or contain sharp edges that could causea crack to form.The vent and air piping must be securely supported,and must not rest its weight on the boiler fittings. DONOT drill or screw into either the vent pipe or air pipe.Failure to properly support the vent and air piping couldresult in vent piping damage, resulting in possible severepersonal injury, death or substantial property damage.When inserting the partially-assembled terminationkit through the roof penetration, wrap plastic or otherprotection over the end of the exposed assembly to preventdebris from entering the pipes. If the air passagesbecome blocked, the boiler will not operate. Once therain cap has been cemented to the assembly, there is noway to correct the problem. The assembly would haveto be replaced if it were cut to be removed and cleaned.Altering the assembly in any way could result in severepersonal injury or death due to toxic flue product emissions.When using AL294C stainless vent pipe, use the ventpipe manufacturer’s PVC adapter when connecting tothe concentric vent attachment.Do not connect any other appliance to the vent pipe ormultiple boilers to a common vent pipe.3. After the assembly has been positioned in the roof opening andall supports have been attached, install a bird screen (purchasedseparately if not included with the kit) and rain cap as follows:a. Place the bird screen on the end of the inner pipe as in Figure58, page 47.b. Cement the rain cap in place.Figure 56 Vertical termination — 3” PVC concentric— single or multiple boilersFigure 57 3” PVC concentric termination supports46Part number 550-142-054/1211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!