12.07.2015 Views

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GV90+ gas-fired water boiler — <strong>Boiler</strong> <strong>Manual</strong>ContentsHow it works . . . . . . . . . . . . . 2GV90+ Water <strong>Boiler</strong> . . . . . . . . 3Please read before proceeding . . . 5Prepare boiler location . . . . . . .6Installations must follow these codes: . . . 6High altitude installations. . . . . . . . . . 6Residential garage installation . . . . . . . 7Check orifice plate — replace if necessary 8Install condensate trap. . . . . . . . . . . . 9Install high altitude air pressure switch whenrequired (only above 5,550 feet) . . . . . . 9Rotate the boiler into position . . . . . . 10Perform hydrostatic pressure test. . . . . 11Install water piping . . . . . . . . 12General piping information. . . . . . . . 12Install relief valve . . . . . . . . . . . . . 12Expansion tank. . . . . . . . . . . . . . . 13System water piping methods. . . . . . . 15Circulators . . . . . . . . . . . . . . . . . 15Simplified pipe/circulator selection . . . 15Baseboard system piping — CIRCULATORzoning (primary/secondary) . . . . . . . 16Baseboard system piping — ZONE VALVEzoning (direct connection) . . . . . . . . 16Radiator system piping . . . . . . . . . . 18Single-zone radiant heating or heat pump 19Adjust balancing valves . . . . . . . . . . 19Multi-zone radiant heating system . . . . 20Piping snow melt systems or combinationsnow melt/space heating systems . . . . . 21Water chiller systems . . . . . . . . . . . 22Multiple boiler installations . . . . 23Placing multiple boilers . . . . . . . . . . 23Controlling multiple GV90+ boilers . . . 23Piping multiple GV90+ boilers . . . . . . 23Multiple boiler water piping. . . . 24Easy-Fit® piping installation . . . . . . . 24Venting & air — general . . . . . . 29When removing a boiler from an existingcommon vent system . . . . . . . . . . . 29Existing vent test procedure. . . . . . . . 29Provide combustion air:. . . . . . . . . . 30Vent and air termination options. . . . . 30DIRECT VENT installations . . . . . . . 30DIRECT EXHAUST installations. . . . . 30Combustion air contamination: . . . . . 30Manifolded combustion air option forDIRECT VENT multiple boiler installations31Air manifold sizing . . . . . . . . . . . . 31Commonwealth of Massachusettsinstallations . . . . . . . . . . . . 34Vent termination requirements . . 35DIRECT VENT — <strong>Boiler</strong> room airopenings . . . . . . . . . . . . . . 36DIRECT VENT — Sidewall with W-Mvent/air plate . . . . . . . . . . . . 37DIRECT VENT — Sidewall with separatepipes. . . . . . . . . . . . . . 39DIRECT VENT — Sidewall with 3”concentric . . . . . . . . . . . . . 41DIRECT VENT — Vertical with separatepipes. . . . . . . . . . . . . . 43DIRECT VENT — Vertical with 3”concentric . . . . . . . . . . . . . 45Concentric termination assembly(sidewall or vertical). . . . . . . . 47Vent and air piping and boiler connections. . . . . . . . . . . . . . 48DIRECT EXHAUST & DIRECT VENT . 48Follow termination instructions . . . . . 48Installing vent and air piping . . . . . . . 48DIRECT EXHAUST ONLY . . . . . . . . 48DIRECT EXHAUST — <strong>Boiler</strong> room airopenings . . . . . . . . . . . . . . 49Combustion air provision. . . . . . . . . 49Sizing combustion air openings . . . . . 49Special considerations . . . . . . . . . . . 49GV90+ boiler WITHOUT other appliancesin room . . . . . . . . . . . . . . . . . . . 50Air openings . . . . . . . . . . . . . . . . 50GV90+ boiler WITH other appliances inroom . . . . . . . . . . . . . . . . . . . . 50DIRECT EXHAUST — Sidewall . . 51DIRECT EXHAUST — Vertical. . . 53Gas piping . . . . . . . . . . . . . 54Connecting gas supply piping. . . . . . . 54Natural Gas. . . . . . . . . . . . . . . . . 55Propane Gas . . . . . . . . . . . . . . . . 55Wiring . . . . . . . . . . . . . . . 56Field wiring. . . . . . . . . . . . . . . . . 56Start-up. . . . . . . . . . . . . . . 59Freeze protection (when used) . . . . . . 59Clean system to remove sediment . . . . 59Water chemistry . . . . . . . . . . . . . . 59Antifreeze. . . . . . . . . . . . . . . . . . 59Check for gas leaks. . . . . . . . . . . . . 60Fill and test water system . . . . . . . . . 60Verify gas/air orifice plate . . . . . . . . . 61Check thermostat circuit(s) . . . . . . . . 61Inspect/fill condensate system . . . . . . 61Final checks before starting boiler . . . . 62To start the boiler . . . . . . . . . . . . . 62If boiler does not start correctly . . . . . 62Check system and boiler after start-up . . 62Gas valve adjustment — altitude over 5,500feet ONLY . . . . . . . . . . . . . . . . . 62Final checklist . . . . . . . . . . . . . . . 64Annual start-up and general maintenanceschedule . . . . . . . . . . 67Annual start-up . . . . . . . . . . 68Address reported problems . . . . . . . . 68Inspect boiler area . . . . . . . . . . . . . 68Inspect boiler interior . . . . . . . . . . . 68Inspect condensate drain system . . . . . 68Inspect all piping for leaks . . . . . . . . 68Inspect gas piping . . . . . . . . . . . . . 68Inspect the water system. . . . . . . . . . 68Inspect expansion tank . . . . . . . . . . 68Inspect air openings . . . . . . . . . . . . 69Inspect vent system and air piping . . . . 69Inspect boiler heating surfaces . . . . . . 69Inspect recuperator . . . . . . . . . . . . 69Inspect igniter . . . . . . . . . . . . . . . 69Inspect temperature mixing system . . . 70Inspect limit controls and cutoffs. . . . . 70Inspect gauges . . . . . . . . . . . . . . . 70Inspect blower motor . . . . . . . . . . . 70Inspect oiled-bearing circulators . . . . . 70Inspect boiler relief valve . . . . . . . . . 71To complete Annual Start-up, performstartup and checks: . . . . . . . . . . . . 71Review with owner. . . . . . . . . . . . . 71Service & maintenance . . . . . . 72Cleaning boiler heating surfaces . . . . . 72Inspecting and cleaning the recuperator . 73Troubleshooting . . . . . . . . . . 75VERIFY PROPER OPERATION AFTERSERVICING. . . . . . . . . . . . . . . . . 75Before troubleshooting . . . . . . . . . . 75Check the following . . . . . . . . . . . . 75Checking the air pressure switch . . . . . 75Igniter. . . . . . . . . . . . . . . . . . . . 76Gas Valve . . . . . . . . . . . . . . . . . . 76Blower Housing . . . . . . . . . . . . . . 76Thermal fuse . . . . . . . . . . . . . . . . 76Return temperature sensor . . . . . . . . 76IBC (integrated boiler control) . . . . . . 77IBC indicator lights — lockout modes . . 77IBC indicator lights — non-lockout modes77Replacement parts . . . . . . . . 89Dimensions and ratings. . . . . 100NOTES . . . . . . . . . . . . . . 104NOTES . . . . . . . . . . . . . . 106Handling ceramic fiber and fiberglassmaterials. . . . . . . . . . 107Installation and servicecertificate . . . . . . . . . . . . 1084Part number 550-142-054/1211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!