12.07.2015 Views

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GV90+ gas-fired water boiler — <strong>Boiler</strong> <strong>Manual</strong>Concentric termination assembly (sidewall or vertical)Figure 58 3” PVC concentric termination assembly — DO NOTattach the rain cap until the termination has beeninserted through the roof or wall and all supports havebeen installed.Assembling concentric termination1. See Figure 58, page 47 for the details of the terminationassembly.2. Prepare the bird screen (purchased separately ifnot included with the kit). Cut the bird screen tosize if required. If the bird screen must be trimmed,cut the bird screen to fit the outside diameter ofthe PVC inner pipe supplied with the terminationkit.3. Partially assemble the vent termination kit in thesequence shown in Figure 58, page 47.DO NOT install the rain cap and birdscreen until the assembly has been insertedthrough the roof (or sidewall)and all supports have been installed.Follow instructions to cover the end ofthe assembly with plastic before insertingthrough the roof penetration to preventdebris from blocking the air passages.4. Use the following procedures to prepare terminationcomponents and cement together.5. Deburr inside and outside of pipe ends.6. Chamfer outside of each pipe end to ensure evencement distribution when joining.7. Clean all pipe ends and fittings.8. Dry thoroughly.9. Dry assemble entire vent or air piping to ensureproper fit before assembling any joint.10. For each joint:a. Handle fittings and pipes carefully to preventcontamination of surfaces.b. Apply primer liberally to both joint surfaces —pipe end and fitting socket.c. While primer is still damp, lightly apply approvedcement to both surfaces in a uniformcoating.d. Apply a second coat to both surfaces. Avoidusing too much cement on sockets to preventcement buildup inside.e. With cement still wet, insert pipe into fitting,twisting ¼ turn. Make sure pipe is fullyinserted.If necessary, you can shorten the lengthsof the inner and outer pipes for a shorterfinished assembly. But you must ensurethe pipes butt correctly at both ends. Failureto properly assemble the concentrictermination can result in flue gas recirculation,causing possible severe personalinjury or death.Part number 550-142-054/1211 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!