12.07.2015 Views

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GV90+ gas-fired water boiler — <strong>Boiler</strong> <strong>Manual</strong>DIRECT EXHAUST — <strong>Boiler</strong> room air openings (cont.)Figure 60 MINIMUM combustion air openings for direct exhaust applications — ALL OPENING SIZES ARE FREE AREAThe GV90+ boiler CANNOT be in the same space with other appliances ifclearances around the GV90+ are less than the recommended service clearancesshown in Figure 2, page 6.Air openingsThe required air opening sizes below are FREE AREA,after reduction for louver obstruction. Note the exceptionbelow for large spaces.GV90+ boilerWITH otherappliances in roomIf the space is smaller thanFigure 2, page 6, provideopenings ONLY as shown onpage 7 and Figure 4, page 7.GV90+ boilerWITHOUT otherappliances in roomTWO openings, each at least:1 square inch per 1,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 4,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 4,000 Btuhof all appliances in the room— OR —ONE opening **, each at least:1 square inch per 3,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 4,000 Btuhof all appliances in the room— OR —ONE opening **, each at least:1 square inch per 3,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 2,000 Btuhof all appliances in the room— OR —ONE opening **, each at least:1 square inch per 3,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 4,000 Btuhof all appliances in the room— OR —ONE opening **, each at least:1 square inch per 3,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 4,000 Btuhof all appliances in the room— OR —ONE opening **, each at least:1 square inch per 3,000 Btuhof all appliances in the roomTWO openings, each at least:1 square inch per 4,000 Btuhof all appliances in the room— OR —ONE opening **, each at least:1 square inch per 3,000 Btuhof all appliances in the room** NOTICE:Requirements for using the SINGLE air openingoption.SPECIAL EXCEPTION FOR LARGE SPACES:A single combustion air opening can be used for cases b, c or d above, sized aslisted, provided that:• The single opening must communicate directly to the outdoors or to a space thatcommunicates directly with outdoors (NOT to an interior space).• The top of the opening must be within 12 inches of the ceiling.• The free area of the opening must be at least equal to the sum of the areas of allequipment vent connectors in the space.NO combustion air openings are needed when the boiler (and other appliances) areinstalled in a space with a volume NO LESS than 50 cubic feet per 1,000 Btuh of all appliancesin the space. That is, total the input of all appliances in MBH (1,000’s of Btuh),then multiply this total times 50. The building MUST NOT be of tight construction.Example: For a total input of 500 MBH (500,000 Btuh), the minimum volume would be50 x 500 = 25,000 cubic feet (3,125 square feet if ceiling height is 8 feet).50Part number 550-142-054/1211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!