12.07.2015 Views

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

Boiler Manual - Weil-McLain

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GV90+ gas-fired water boiler — <strong>Boiler</strong> <strong>Manual</strong>DIRECT VENT — Sidewall with W-M vent/air plate (continued)Install <strong>Weil</strong>-<strong>McLain</strong> vent/air capThe inside and outside cover plates are stamped to identifythe exhaust (vent) and intake (air) openings. Makesure to orient the plates correctly.1. Locate termination opening and avoid obstructions:a. Use the template supplied with the termination kit.b. Locate the template on the outside building surface where thepenetration is to be made.c. Make sure there will be no obstructions that might preventproper placement of the termination.d. Use the template to mark the locations for the four mountingholes, flue pipe and air pipe. Level the template with a spiritlevel.For the <strong>Weil</strong>-<strong>McLain</strong> plate, the template must be level toensure the flue and air pipe will be side-to-side, as shownin Figure 45. Failure to comply could result in severepersonal injury, death or substantial property damage.e. Cut holes in the wall as shown in Figure 46, using the locationmarks made with the template. For best results, use a smalldiameter,long drill bit to drill centering holes for the flue andair pipe openings. Then drill the large openings from both theinside and outside.f. The flue pipe and air pipe may be run through a rectangularcutout (as marked on the template) in lieu of two separateholes if desired.2. Drill holes for the screws or plastic anchors to secure the outsideplate. Install the outside plate and mount the termination on theplate (temporarily).a. Cut the flue pipe so the extension through the wall will causethe vent pipe to fully extend into the termination socket.b. Cut the air pipe so the extension through the wall will butt theair pipe against the stops inside the termination.c. Temporarily slide the flue and air pipes through the opening(s).Slide the inside wall plate over the two pipes and into positionon the inside wall.d. Position the inside plate so the flue pipe and air pipe slopedownward slightly toward the boiler (1/4” per foot).e. Mark the four (4) mounting holes for the plate.f. Remove the vent and air pipe, drill the four mounting holes,and mount the inside plate.3. Test fit the vent/air termination on the vent pipe. Make sure thevent pipe fully penetrates the termination socket and the air pipebutts against the interior stops.4. Apply silicon RTV sealant to the interior of the vent terminationand slide onto vent pipe. Rotate slightly to spread the silicon toensure a tight seal around the vent pipe.5. Secure the termination in place using the four #10 x ½” sheet metalscrews and lock washers (see Figure 46).Figure 44 Multiple terminations — <strong>Weil</strong>-<strong>McLain</strong> vent/air plate — clearance from vent of one toair intake of the nextFigure 45 Hole preparation in wall — <strong>Weil</strong>-<strong>McLain</strong>vent/air plate (use template provided)1 Inside wall2 Drill: 3½" diameter for 3" air pipe; locate using template provided3 For combustible materials, drill: 4" diameter for 3" vent pipeFor noncombustible materials, drill 3½" diameter for 3" vent pipeLocate opening using template provided4 Drill mounting screw holes using template providedFigure 46 Termination assembly — <strong>Weil</strong>-<strong>McLain</strong>vent/air plate1 Vent termination (3”)2 Lock washer, #10 (4)3 Sheet metal screw, #10 x ½” (4)4 Plastic wall anchor (8)5 Sheet metal screw, #10 x 1¼” (8)6 Outer mounting plate7 Inner mounting plate8 Vent pipe (butt to screen in termination)9 Air pipe (butt to stops in termination)38Part number 550-142-054/1211

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!