EMIS Interface Description - Measurement Solutions
EMIS Interface Description - Measurement Solutions
EMIS Interface Description - Measurement Solutions
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sening ®<br />
Innovative Tank Truck Systems<br />
Discharge<br />
41,S, , ,0, , , ,V2 3)<br />
41,S,V1, ,0, , , ,V2 3)<br />
Override (at discharge)<br />
41,S,V1, ,0, , ,8<br />
41,S,V1, ,0, , ,8,V2 3)<br />
Loading Mode<br />
41,S,V1, ,1<br />
41,S,V1,V2,1<br />
Uncoded loading<br />
41,S,V1, ,1, , , ,1 3)<br />
41,S,V1,V2,1, , , ,1 3)<br />
TYPE V1 V2<br />
TKNG “0“ = End of discharge<br />
TKNG CoNo at start of discharging<br />
AsNo<br />
or<br />
CoNo if no AS installed<br />
AsNo<br />
or<br />
CoNo if no AS installed<br />
OVR KaNr “0“ = End of override<br />
OVR KaNr<br />
Product code correction (with loading)<br />
41,S,V1, ,1, , ,8<br />
41,S,V1,V2,1, , ,8<br />
AsNo<br />
or<br />
CoNo if no AS installed<br />
PKNG KaNr “0“ = end of loading<br />
PKNG KaNr PrCo at start of loading<br />
UCL KaNr “0“ = end of loading<br />
UCL KaNr PrCo at start of loading<br />
1 in [8] bezeichnet uncodierte Beladung<br />
PCC KaNr “0“ = end of loading<br />
PCC KaNr PrCo at start of loading<br />
Specification<br />
Euro <strong>Interface</strong> <strong>EMIS</strong><br />
<strong>Interface</strong> <strong>Description</strong><br />
MNF19002EUS / DOK-411E Rev. 2.00 / MB / jp / Juli 2008 81<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
A<br />
Anhang A Protokolle