12.07.2015 Views

37º IAHS World Congress on Housing: - Universidad de Cantabria

37º IAHS World Congress on Housing: - Universidad de Cantabria

37º IAHS World Congress on Housing: - Universidad de Cantabria

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

XXXVII <str<strong>on</strong>g>IAHS</str<strong>on</strong>g><str<strong>on</strong>g>World</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>gress</str<strong>on</strong>g> <strong>on</strong> <strong>Housing</strong>October 26 – 29, 2010, Santan<strong>de</strong>r, SpainCODE: 1008SUSTAINABLE BUILDING RETROFITTINGFrancisco Esteban Lefler and Maria José C<strong>on</strong><strong>de</strong> LazaDirectorate of Innovati<strong>on</strong> and TechnologyFCC CONSTRUCCION, S.A.e-mail: FEsteban@fcc.es; MC<strong>on</strong><strong>de</strong>@fcc.esAbstractThe “Sustainable Building Retrofitting” (RS) project has been approved as an IntegratedProject by CDTI (Centro para el Desarrollo Tecnológico Industrial) and the C<strong>on</strong>tract wassigned last 01-07-2010. It will last 4 years and its Budget is close to 7 milli<strong>on</strong> Euros. Themain objective is the <strong>de</strong>velopment of an integrated system for management of sustainableretrofitting of existing buildings, in or<strong>de</strong>r to improve their energy efficiency. Themethodology and computer tools are <strong>de</strong>veloped in the project framework, according withcurrent Spanish legislati<strong>on</strong> and Building Energy related classificati<strong>on</strong>.This will make possible its standardizati<strong>on</strong> and its future use as a support tool for <strong>de</strong>cisi<strong>on</strong>. Aresearch <strong>on</strong> the potential use of renewable energy sources and the best use of c<strong>on</strong>venti<strong>on</strong>alenergies in existing buildings will be performed. A software mo<strong>de</strong>l for <strong>de</strong>finiti<strong>on</strong> of theirintegrati<strong>on</strong> and analysis of building resp<strong>on</strong>se will be <strong>de</strong>veloped and assessed for realbuildings. Finally, a real retrofitting experience will be implemented and analyzed as a<strong>de</strong>m<strong>on</strong>strator for the Project.. Besi<strong>de</strong>s the main objective of the project, additi<strong>on</strong>al <strong>de</strong>rivedtargets have been <strong>de</strong>tected and will also be addressed. Am<strong>on</strong>g these are: reducti<strong>on</strong> ofc<strong>on</strong>venti<strong>on</strong>al energy c<strong>on</strong>sumpti<strong>on</strong> during the use and operati<strong>on</strong>, <strong>de</strong>crease of CO2 and otherpollutant emissi<strong>on</strong>s and improvement of resi<strong>de</strong>ntial living indoor envir<strong>on</strong>mental c<strong>on</strong>diti<strong>on</strong>sand workplace health c<strong>on</strong>diti<strong>on</strong>s in office buildings.37º <str<strong>on</strong>g>IAHS</str<strong>on</strong>g> <str<strong>on</strong>g>World</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>gress</str<strong>on</strong>g> On <strong>Housing</strong> Science 339

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!