12.07.2015 Views

37º IAHS World Congress on Housing: - Universidad de Cantabria

37º IAHS World Congress on Housing: - Universidad de Cantabria

37º IAHS World Congress on Housing: - Universidad de Cantabria

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

XXXVII <str<strong>on</strong>g>IAHS</str<strong>on</strong>g><str<strong>on</strong>g>World</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>gress</str<strong>on</strong>g> <strong>on</strong> <strong>Housing</strong>October 26 – 29, 2010, Santan<strong>de</strong>r, SpainCODE: 1010OPERHA – FIBRE REINFORCEMENT INREHABILTITATION (CASE STUDY)Jesus Castillo Oli, Maria SortinoHeritage DepartmentFundación Santa María la RealE-mail: operha@santamarialareal.orgKey words: heritage, Romanesque, strengthening system, basalt fiber.AbstractThe Foundati<strong>on</strong> Santa Maria la Real participated, between 2006 and 2008, in a Europeanproject named “Open and fully compatible next generati<strong>on</strong> of strengthening system for therehabilitati<strong>on</strong> of Mediterranean building heritage” (OPERHA).This project had two principal objectives, the study and the applicati<strong>on</strong> of strengtheningsystems for rehabilitati<strong>on</strong> and to promote the collaborati<strong>on</strong> between Mediterranean countries.The role of the Foundati<strong>on</strong> in the project is to apply the fibre reinforced technique in a realcase study.After a first general analysis of the building’s typological and structural characteristics, westarted working <strong>on</strong> the interventi<strong>on</strong> of the Romanesque church.The case study focuses <strong>on</strong> the sacristy of the church of Renedo <strong>de</strong> la Inera. A map of cracksappeared due to movements in the foundati<strong>on</strong> and walls. Presently the church is stable;however previous movement has left some scars.The first step was measuring and surveying the actual state of the church then the followinginterventi<strong>on</strong>s took place:• To guarantee the stability of the mural paintings during the reparati<strong>on</strong> of the vault, atemporary protective covering was placed over the paintings.• To reinforce the vault during the restorati<strong>on</strong> process, a support system was placedc<strong>on</strong>sisting of three rows of seven braces which ma<strong>de</strong> a total of 21 braces thatsupported wood planks.• After the roof structure was removed and the dirt was cleaned away, we started toapply the fibre reinforced system. Two windows that were buried un<strong>de</strong>r inertmaterial were discovered.• Reinforcing the outsi<strong>de</strong> of the vault produced a self supporting body which retainedthe weight of ashlars in the case of movement; also by working <strong>on</strong> the exterior of thevault, you avoid touching any mural paintings found <strong>on</strong> the interior which was thecase here.37º <str<strong>on</strong>g>IAHS</str<strong>on</strong>g> <str<strong>on</strong>g>World</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>gress</str<strong>on</strong>g> On <strong>Housing</strong> Science 341

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!