12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604804A: Logistics and EngineerEquipment - Eng DevPROJECT194: ENGINE DRIVEN GEN ED(RPSTL), Technical Manuals and Training Packages in preparation of Milestone C and Phase III-Production and Fielding.Prepare performance Specification for LAMPS(Large Advanced Mobile Power Sources). Begin Phase I SDD for LAMPS.E. Performance MetricsPerformance metrics used in the preparation of this justification material may be found in the FY 2010 <strong>Army</strong> Performance Budget Justification Book, dated May 2010.UNCLASSIFIED<strong>Army</strong> Page 5 of 86 R-1 Line Item #109<strong>Volume</strong> <strong>5B</strong> - 82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!