12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604804A: Logistics and EngineerEquipment - Eng DevPROJECTL41: WATER AND PETROLEUMDISTRIBUTION - EDB. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012TotalDescription: Funding is provided for the following effortFY 2010 Accomplishments:Integration of component level improvements at the system level for the Fuel System Supply Point (FSSP).Reliability and limited user testing. Preparation of component level performance based specifications.FY 2011 Plans:Continue improvements for the Family of Fuel System Supply Points (FSSPs).FY 2012 Base Plans:Integration of component level improvements at the system level for the Fuel System Supply Point (FSSP).Reliability and limited user testing. Preparation of component level performance based specifications.Title: In-house low/high temperature testing.Description: Funding is provided for the following effort.Articles:- 0.3010- - -FY 2011 Plans:Continue to refine the property prediction models. In-house low/high temperature testing.Title: Tactical Water Purification System (TWPS) and Lightweight Water Purification System (LWP).Articles:- 0.7550- - -Description: Funding is provided for the following effortFY 2011 Plans:Integrate product improvements and conduct system level testing and evaluation of improved Tactical WaterPurification System (TWPS) and Lightweight Water Purification System (LWP) and Reverse Osmosis WaterPurification Units, Hippo System and the Unit Water Pod (Camel) system. Based on component testing results,perform engineering integration analysis and system design to incorporate in-line water quality monitoring,and perform technical and operational testing. Perform engineering integration analysis and system design toincorporate chlorine dosing and control into the Hippo system and Unit Water Pod System (Camel) system andconduct technical and operational testing. Prepare technical data to incorporate improved components intoproduction units and to support system modernization through spares.Title: Integration of component level improvements at the system level for the Fuel System Supply Point (FSSP). - 0.278 - - -UNCLASSIFIED<strong>Army</strong> Page 42 of 86 R-1 Line Item #109<strong>Volume</strong> <strong>5B</strong> - 119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!