12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0605626A: Aerial Common Sensor - SDDPROJECTAC5: Enhanced Medium Alt Recon Surv Sys(EMARSS) (MIP)C. Other Program Funding Summary ($ in Millions)Line Item FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012Total FY 2013 FY 2014 FY 2015 FY 2016Cost ToComplete Total Cost• Aircraft Procurement: Aircraft88.483 539.574 539.574 504.321 243.672 122.699 0.000 1,741.512Procurement• ACS NSA MIP: ACS NSA MIP 2.022 1.350 10.634 10.634 7.395 7.395 Continuing Continuing• GSCS NSA MIP: GRCS NSA MIP 2.780 0.685 5.246 5.246 3.601 3.601 Continuing ContinuingD. Acquisition StrategyThe Enhanced Medium Altitude Reconnaissance and Surveillance System (EMARSS) is a program of record based on an <strong>Army</strong> G-3/5/7 Directed Requirement(DR) signed 11 December 2009. The decision to pursue EMARSS is a direct result of relooking the <strong>Army</strong>'s approach to the Airborne Intelligence Surveillance andReconnaissance (ISR) construct and applying the lessons learned from current overseas operations. The <strong>Army</strong> Material Development Decision (MDD) review wascompleted in 2Q FY10. The program entered the acquisition process in the Engineering and Manufacturing Development (EMD) phase with 4Q10 contract award. Thisaward was competitively awarded to a single contractor. An option for LRIP is anticipated to be part of this effort. MS C is scheduled for 4QFY12 and FRP in 3QFY13.E. Performance MetricsPerformance metrics used in the preparation of this justification material may be found in the FY 2010 <strong>Army</strong> Performance Budget Justification Book, dated May 2010.UNCLASSIFIED<strong>Army</strong> Page 5 of 9 R-1 Line Item #130<strong>Volume</strong> <strong>5B</strong> - 499

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!