12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-3, RDT&E Project Cost Analysis: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)Test and Evaluation ($ in Millions)Cost Category ItemLife Cycle ConfigurationAnalyses & Support to InitialCapabilities DocumentDevelopmentTesting of the Metalworking& Machining Shop Set(MWMSS)Further develop SATSField Maintenance Module& viability of adding LoadHandling System capabilityForward Repair System (FRS)enhancements, FlatrackRedesign and Universal SlingTestingTesting of Support EquipmentItems and ConfigurationsTesting of Fire SuppressionTesting of Hydraulic SystemsTest & Repair Unit (HSTRU)ContractMethod& TypeC/FPPerformingActivity & LocationATEC/PM SKOT/CASCOM/MANSCEN:(MD, IL, VA, MO)Total PriorYearsCostCostR-1 ITEM NOMENCLATUREPE 0604804A: Logistics and EngineerEquipment - Eng DevFY 2011AwardDateCostFY 2012BaseAwardDateCostFY 2012OCOPROJECTL46: Maintenance Support EquipmentAwardDateFY 2012TotalCostCost ToCompleteTotal CostTargetValue ofContract0.830 - - - - Continuing Continuing ContinuingSS/FP ATEC:Aberdeen, MD - 1.000 0.100 - 0.100 Continuing Continuing ContinuingSS/FP PM SKOT:Harrison, MI 0.263 - - - - Continuing Continuing ContinuingC/BOAC/BOAC/FPSS/FPPM SKOT/<strong>Army</strong> Test &Evaluation Command(ATEC):(IL, MD)ATEC/ PM SKOT/ECBC:(MD, MI, IL)ATEC/PM SKOT/ECBC:(MD, MI, IL)ATEC/US<strong>Army</strong> ResearchLab:Aberdeen, MD0.047 - - - - Continuing Continuing Continuing- - - - - Continuing Continuing Continuing- - - - - Continuing Continuing Continuing0.341 - - - - Continuing Continuing ContinuingSubtotal 1.481 1.000 0.100 - 0.100Total PriorYearsCost FY 2011FY 2012BaseFY 2012OCOFY 2012TotalProject Cost Totals 4.446 3.178 3.165 - 3.165Cost ToCompleteTotal CostTargetValue ofContractRemarksUNCLASSIFIED<strong>Army</strong> Page 67 of 86 R-1 Line Item #109<strong>Volume</strong> <strong>5B</strong> - 144

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!