12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604818A: <strong>Army</strong> Tactical Command &Control Hardware & SoftwarePROJECTJN1: JOINT NETWORK NODE (JNN)TESTINGcombined program. The WIN-T ACAT 1D program now consist of four separately reporting Increments, with JNN re-designated as WIN-T Increment 1. RDT&E fundingwill be used to test the output of the production.FY 12: Funding will be used for Operational Test of the Inc 1b technical insertion scheduled to be conducted 3rd quarter FY 12 in conjunction with Inc 2 InitialOperational Test and Evaluation (IOT&E).E. Performance MetricsPerformance metrics used in the preparation of this justification material may be found in the FY 2010 <strong>Army</strong> Performance Budget Justification Book, dated May 2010.UNCLASSIFIED<strong>Army</strong> Page 39 of 42 R-1 Line Item #115<strong>Volume</strong> <strong>5B</strong> - 308

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!