12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604818A: <strong>Army</strong> Tactical Command &Control Hardware & SoftwarePROJECTC34: ARMY TAC C2 SYS ENGB. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2010 FY 2011 FY 2012WNaN Radio for delivery by FEB 11. NSA provided the TYPE II requirements that WNaN must meet. July 2010 PEO C3T fieldassessment at Ft Devens; first <strong>Army</strong> field assessment at radio. August 2010 WNaN IPT Decision Point 1 (Go/No Go for <strong>Army</strong>field experiment. Decision by <strong>Army</strong> IPT chaired by ASA (ALT). Decision based on results of PEO C3T and EPG integrationtest results.<strong>Army</strong> Field Experiment as designated in MOA. Conducted at Ft Benning utilizing <strong>Army</strong> EXFOR (Company Slice),Experiment conducted by Maneuver Battle Lab and supported by PEO C3T, (Sep10) Completion of Internal WNaN evaluationreport (Feb 11); PEO C3T <strong>Army</strong> Staff Briefings and report to VCSA (March 11).C. Other Program Funding Summary ($ in Millions)N/AAccomplishments/Planned Programs Subtotals 28.420 12.220 15.193D. Acquisition StrategyThis project provides the technical and programmatic disciplines required for systems engineering and integration, experimentation, acquisition management, testing,interoperability, support to fielding and sustainment to ensure an interoperable and affordable <strong>Army</strong> Tactical Command and Control Systems (ATCCS). Fiscal Year2011 will focus on "Systems of Systems" System Engineering and Integration for the tactical network with increased emphasis on immediate Warfighter needs aswell as leveraging emerging technologies, through the G3 LandWarNet Capability Set Development and Integration. Fiscal Year 2012 will focus on working the <strong>Army</strong>Network Modernization strategy and implementation to include: emerging technologies; coordination of network services; current and force integrated C5ISR network/transport architectures; integrated developmental, technical, and operational test schedules/documentation; and the tactical assessment and execution of the enterpriseframework.E. Performance MetricsPerformance metrics used in the preparation of this justification material may be found in the FY 2010 <strong>Army</strong> Performance Budget Justification Book, dated May 2010.UNCLASSIFIED<strong>Army</strong> Page 35 of 42 R-1 Line Item #115<strong>Volume</strong> <strong>5B</strong> - 304

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!