12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0605450A: Joint Air-to-Ground Missile(JAGM)PROJECTJA6: JOINT AIR-TO-GROUND MISSILE(JAGM)B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2010 FY 2011 FY 2012PDR actions are closed.Title: Prototype FlightsArticles:Description: During Technology Demonstration (TD) contract execution, the contractors were required to complete a PreliminaryDesign Review (PDR) for a system that meets the JAGM Performance Specification and to build and fly prototype missiles todemonstrate integration of the critical technologies.35.2050- -FY 2010 Accomplishments:TD Phase missile test flights completed September 2010.Title: Software Simulation Algorithm MaturityArticles:7.18006.2970-Description: The program will use a Modeling and Simulation (M&S) strategy that provides an Integrated Flight Simulation (IFS),a software test station, and a high fidelity hardware in the loop simulation facility.FY 2010 Accomplishments:The IFS has been developed by both JAGM contractors and preliminary verification activities have begun. Performanceassessments of the JAGM contractor's software was completed for the preliminary design review and indicated performancecapability above the expected level for this phase of the program.FY 2011 Plans:The IFS results will supplement the flight test data to determine system effectiveness during test. The flight test data will supportverification and validation by independent agents from the <strong>Army</strong> and Navy.Title: Design Verification Test (DVT)/Engineering Development Test (EDT)Articles:38.984045.2860-Description: The contractor will conduct design verification testing and component qualification testing leading to a Critical DesignReview (CDR).FY 2010 Accomplishments:Initial DVT component tests complete. TD phase Engineering Development Tests initiated missile test flights Jun 2010. Contractortests were completed Sep 2010.FY 2011 Plans:UNCLASSIFIED<strong>Army</strong> Page 4 of 11 R-1 Line Item #125<strong>Volume</strong> <strong>5B</strong> - 444

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!