12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIEDExhibit R-3, RDT&E Project Cost Analysis: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)Product Development ($ in Millions)Cost Category ItemMITRE Corp (Systemof System Integration &Validation)CACI (JB Mgt)CECOM R2CECOM/SEC MatrixIn-HouseContractMethod& TypeFFRDCC/CPAFC/CPFFMIPRAllotPerformingActivity & LocationSoS Integration:FortHood, TX/Eatontown,NJSoS Integration:FortHood, TXEnterprise Integration& ValidationInfrastructure:FortHood, TXCM and IT/IA:FortHood, TXSos Integration:FortHood, TXTotal PriorYearsCostCostR-1 ITEM NOMENCLATUREPE 0604818A: <strong>Army</strong> Tactical Command &Control Hardware & SoftwareFY 2011AwardDateCostFY 2012BaseAwardDateCostFY 2012OCOPROJECTC29: CENTRALIZED TECHNICAL SUPPORTFACILITY (CTSF)AwardDateFY 2012TotalCostCost ToCompleteTotal CostTargetValue ofContract9.662 1.755 1.884 - 1.884 Continuing Continuing Continuing2.026 1.785 - - - Continuing Continuing 0.000- - 0.736 - 0.736 Continuing Continuing Continuing- 0.420 - - - Continuing Continuing 0.000- 0.272 1.160 - 1.160 Continuing Continuing ContinuingSubtotal 11.688 4.232 3.780 - 3.780RemarksIn March 2011, the CACI(JB Mgmt) contract for System of Systems Integration will transition to CECOM R2 G3 contract vehicle.NOTE: Line for CACI (JB Mgt) above, FY11 Cost, 1785 and Award Date, 3Q must be re-entered. Data was lost when the line was inadvertently deleted. Unable to reconstruct due toFY11 Lock. Addition of 1785 will then balance FY Total at 17,720.Support ($ in Millions)Cost Category ItemCECOM MatrixIn-House SupportContractMethod& TypeMIPRAllotPerformingActivity & LocationTest, Configuration<strong>Management</strong>, ITSupport:Fort Hood,TX/Aberdeen ProvingGrounds, MD<strong>Management</strong>Operations, LogisticsSupport:Fort Hood, TXTotal PriorYearsCostCostFY 2011AwardDateCostFY 2012BaseAwardDateCostFY 2012OCOAwardDateFY 2012TotalCostCost ToCompleteTotal CostTargetValue ofContract1.619 0.304 0.311 - 0.311 Continuing Continuing Continuing2.688 1.818 1.355 - 1.355 Continuing Continuing ContinuingSupplies/Equipment C/UCA - - 0.298 - 0.298 Continuing Continuing ContinuingUNCLASSIFIED<strong>Army</strong> Page 24 of 42 R-1 Line Item #115<strong>Volume</strong> <strong>5B</strong> - 293

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!