12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)COST ($ in Millions)L43: ENGINEER SUPPORTEQUIPMENT - EDQuantity of RDT&E ArticlesNoteNot applicable for this item.FY 2010 FY 2011FY 2012BaseR-1 ITEM NOMENCLATUREPE 0604804A: Logistics and EngineerEquipment - Eng DevFY 2012OCOFY 2012Total FY 2013 FY 2014 FY 2015 FY 2016PROJECTL43: ENGINEER SUPPORT EQUIPMENT - EDCost ToComplete Total Cost0.939 0.874 1.096 - 1.096 1.895 1.190 1.182 1.272 Continuing ContinuingA. Mission Description and Budget Item JustificationThis project supports development, demonstration, testing and evaluation within the Engineering Support Equipment arena for the Hydraulic Electric PneumaticPetroleum Operated Equipment (HEPPOE), Surveying, Individual Firefighter Support, Concrete and Masonry, Electricians, Plumbers, Pipefitters, Field Lighting Sets,Diving Equipment, Surface Swimmer Support Sets, Surface Supplied Diving Set, procurement of new Technical Tools, Pioneer Support Set, and the Pioneer LandClearing and Building Erection Set. Funding will support the procurement of market samples and testing for Hazard ID & Marking, Pioneer Light Field Engineering,Underwater Construction Set, Closed Circuit Scuba Set, the Family of Diving Air Compressors, and Assault Boats and Outboard Motors. Efforts will also involvemodernization of the Swimmer Support Sets and Individual Swimmer Support Sets as well as existing Sets, Kits, and Outfits (SKOs).B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012TotalTitle: Document DevelopmentArticles:- 0.12500.050 - 0.050Description: Funding is provided for the following effortFY 2011 Plans:Coordinate to have Initial Capabilities Documents (ICDs), Capability Development Documents (CDDs), andCapabilities Production Documents (CPDs) written for various programsFY 2012 Base Plans:Coordinate to have Initial Capabilities Documents (ICDs), Capability Development Documents (CDDs), andCapabilities Production Documents (CPDs) written for various programsTitle: Underwater Construction SetsDescription: Research, Development, and Testing of Underwater Construction SetsFY 2011 Plans:Articles:- 0.17500.357 - 0.357UNCLASSIFIED<strong>Army</strong> Page 49 of 86 R-1 Line Item #109<strong>Volume</strong> <strong>5B</strong> - 126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!