12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604870A: Nuclear Arms ControlMonitoring Sensor NetworkPROJECTSE1: NACT SENSOR ENGINEERINGB. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2010 FY 2011 FY 2012Plan / Support joint US / PTS technology conferences / exchanges (i.e. Workshop on Medical Isotope Production (WOSMIP) II,PTS / US Technology Working Group 2nd Annual Conference; PTS PKI / Command & Control experiment; US / Great Britaintechnology / operations interchange meetings). Provide technical and operational support for the PTS / US sponsored monitoringtechnology developments, standard reliability and operations /maintenance profile conference. Prepare / Support IMS technologyoverview briefings (OSD ASD Nuclear, Chemical, Biological Program) in preparation for inter agency meetings.FY 2012 Plans:Plan / Support joint US / PTS technology conferences / exchanges (i.e. Workshop on Medical Isotope Production (WOSMIP) II,PTS / US Technology Working Group 2nd Annual Conference; PTS PKI / Command & Control experiment; US / Great Britaintechnology / operations interchange meetings). Provide technical and operational support for the PTS / US sponsored monitoringtechnology developments, standard reliability and operations /maintenance profile conference. Prepare / Support IMS technologyoverview briefings (OSD ASD Nuclear, Chemical, Biological Program) in preparation for inter agency meetings.Title: Prototype Sensor DevelopmentArticles:1.30001.40001.445Description: .FY 2010 Accomplishments:Manufactured / deployed (i.e. US Seismic Array Project, the Israeli Sayarim infrasound experiment; UTTR) over 100 prototypeinfrasound next generation sensors for extensive and reliability and dynamic range performance / validation testing in supportof the infrasound data collection; event identification; source location and signal analysis. CTBT performance requirements,acceptance testing at the Sandia National Laboratory.FY 2011 Plans:Deploy next generation sensors for field and operational testing within the PTS Sayarim Infrasound Experiment. Deploy nextgeneration sensors for dynamic operational performance testing at the UTTR ordinance disposal site. Deploy next generationsensors to the PTS Conrad Site for dynamic performance testing against CTBT acceptance requirementsFY 2012 Plans:Deploy next generation sensors for field and operational testing within the PTS Sayarim Infrasound Experiment. Deploy nextgeneration sensors for dynamic operational performance testing at the UTTR ordinance disposal site. Deploy next generationsensors to the PTS Conrad Site for dynamic performance testing against CTBT acceptance requirementsTitle: Radionuclide Particulate / Xenon Gas Sensor System DevelopmentArticles:0.40000.40000.397UNCLASSIFIED<strong>Army</strong> Page 3 of 9 R-1 Line Item #122<strong>Volume</strong> <strong>5B</strong> - 385

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!