12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0605455A: SLAMRAAMPROJECTS35: SLAMRAAMB. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2010 FY 2011 FY 2012Perform Line Replaceable Units (LRU) design updates and qualification. Conduct a Functional Configuration Audit (FCA) insupport of the Milestone C decision.FY 2012 Plans:Complete Line Replaceable Units (LRU) design updates and qualification. Conduct a Manufacturing Readiness Assessment insupport of Milestone C.Title: System Engineering/Program <strong>Management</strong> (SE/PM)Description: CMDS Project Office cost for execution of project management activities to include government lead for executionof Milestone C preparation and program close-out activities. This includes government labor, contractor labor and operatingexpenses.Articles:- 5.00007.810FY 2011 Plans:Government PM execution of Engineering and Manufacturing (EMD) activities to support refurbishment of prototypes, redesignand qualification of line replaceable units and conduct of functional configuration audit.FY 2012 Plans:Government PM execution of Engineering and Manufacturing (EMD) activities to support completion of the refurbishment ofprototypes, redesign and qualification of line replaceable units, conduct of physical configuration audit and program close-outactivities.Title: Close Out (Contract, Facilities, Disposition)Description: Disposition Advanced Procurement of the IFCS. Disposition equipment and shutdown facilities. Shutdown ProductOffice (personnel, MOAs/MOUs)- - 9.463FY 2012 Plans:Estimated funding to complete the disposition of equipment and close-out of personnel and facilities.Accomplishments/Planned Programs Subtotals - 23.700 19.931UNCLASSIFIED<strong>Army</strong> Page 3 of 9 R-1 Line Item #126<strong>Volume</strong> <strong>5B</strong> - 454

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!