12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)COST ($ in Millions)L41: WATER AND PETROLEUMDISTRIBUTION - EDQuantity of RDT&E ArticlesFY 2010 FY 2011FY 2012BaseR-1 ITEM NOMENCLATUREPE 0604804A: Logistics and EngineerEquipment - Eng DevFY 2012OCOPROJECTL41: WATER AND PETROLEUMDISTRIBUTION - EDFY 2012Total FY 2013 FY 2014 FY 2015 FY 2016Cost ToComplete Total Cost2.405 2.734 2.079 - 2.079 3.912 3.749 3.771 3.804 Continuing ContinuingA. Mission Description and Budget Item JustificationDescription: This project provides all services with ample supply of clean fuel and water. The <strong>Army</strong> has the mission to supply fuel for all land-based forces, includingthe Marines and the Air Force, and must supply bulk drinking water to the soldiers. This System Development and Demonstration (SDD) program enables the<strong>Army</strong> to improve maneuver sustainment operations to meet the demands of the Stryker Brigade Combat Teams and Future Force. The mission includes receivingand transferring petroleum from trucks, ships, pipelines and permanent and temporary storage facilities; moving petroleum from storage to and within corps anddivision areas; fuel quality surveillance testing; and, dispensing in support of tactical operations, including rapid refueling of aircraft. The mission covers purification,storage, distribution, and quality control of water. The <strong>Army</strong> cannot fight without clean fuel and water. These research and development (R&D) missions support thedevelopment and enhancement of rapidly deployed Petroleum and Water equipment which enables the <strong>Army</strong> to achieve transformation vision by providing a highlymobile and self-sustaining system in hostile theaters of operation.B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)Title: Evaluate portability advancements.Description: Funding is provided for the following effortArticles:FY 2010 FY 20110.1220FY 2012BaseFY 2012OCOFY 2012Total- - - -FY 2010 Accomplishments:Evaluate the portability advancements designed into the near-infrared (NIR) spectrometer from earlier efforts.Evaluate new fiber optic probes and demonstrate for CASCOMTitle: Family of Fuel System Supply Points (FSSPs)Description: Funding is provided for the following effortArticles:0.1410- - - -FY 2010 Accomplishments:Continue improvements for the Family of Fuel System Supply Points (FSSPs).Title: Integrate product improvements and conduct system level testing and evaluation.Articles:0.2200- 0.904 - 0.904UNCLASSIFIED<strong>Army</strong> Page 40 of 86 R-1 Line Item #109<strong>Volume</strong> <strong>5B</strong> - 117

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!