12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604818A: <strong>Army</strong> Tactical Command &Control Hardware & SoftwarePROJECTC29: CENTRALIZED TECHNICAL SUPPORTFACILITY (CTSF)B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2010 FY 2011 FY 2012sensor and platform level for validation of end-to-end communications and interoperability, platform through <strong>Army</strong> Corps to Joint/Coalition. Data product and software patch validation; network support for integration and test floors; network support to fieldedunits upon request.FY 2012 Plans:Support to material developer for CS 13-14 integration and testing. Support to backward compatibility testing between CS 11-12and CS 13-14. Identify and incorporate software tools to monitor performance and assist in issue resolution. Integrate andimplement HBSS technology. Conduct integration and testing of Afghan Mission Network providing configuration, architecturedesign, and test case generation; extend integration and test architectures to include Program of Record (POR) and non-PORradio communications devices to provide MatDev testing in realistic environments; use DREN to provide CTSF test supportto PEO-I and WSMR for sensor and platform level for validation of end-to-end communications and interoperability, platformthrough <strong>Army</strong> Corps to Joint/Coalition. Data product and software patch validation; network support for integration and test floors;network support to fielded units upon request.Title: Facilities, Site Operations and MaintenanceArticles:3.55904.1480-Description: Maintain 250,000 square foot facility, with 41,305 square feet dedicated to <strong>Army</strong> Integration Certification (AIC)testing and systems engineering.FY 2010 Accomplishments:Continued to provide infrastructure support for 250,000 square foot facility and 41,305 square feet dedicated to AIC testing floorsand integration labs.FY 2011 Plans:Continue to provide infrastructure support for 250,000 square foot facility and 41,305 square feet dedicated to AIC testing floorsand integration labs.FY12 and beyond, this effort will be apportioned and allocated to mission areas AIC Test, EIVI, CM and Program Office.Title: <strong>Management</strong> Operations/Program OfficeArticles:2.55802.59901.416Description: Provide management operations consisting of programming and executing funds, personnel, contracts, andidentifying reimbursable tests and allocating/collecting appropriate funds.FY 2010 Accomplishments:UNCLASSIFIED<strong>Army</strong> Page 20 of 42 R-1 Line Item #115<strong>Volume</strong> <strong>5B</strong> - 289

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!