12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)COST ($ in Millions)FY 2010 FY 2011FY 2012BaseR-1 ITEM NOMENCLATUREPE 0604854A: Artillery Systems - EMDFY 2012OCOPROJECT516: PALADIN/FAASVFY 2012Total FY 2013 FY 2014 FY 2015 FY 2016Cost ToComplete Total Cost516: PALADIN/FAASV 147.512 53.624 120.146 - 120.146 82.995 25.229 24.810 5.283 Continuing ContinuingQuantity of RDT&E ArticlesA. Mission Description and Budget Item JustificationThe Paladin/Field Artillery Ammunition Support Vehicle (FAASV) Integrated <strong>Management</strong> (PIM) process will provide for the procurement of the approved obsolescenceand sustainment modifications to the 155MM Self-Propelled Howitzer and FAASV, increase reliability and maneuverability as well as reduce life cycle costs. These willinclude leveraging Bradley common components, integrating the engine, transmission, final drives, and suspension. It will also replace obsolete components such asthe Dynamic Reference Unit-Hybrid (DRU-H), hydraulics, fatigued hull structures as well as focus on powertrain, power management and electronic sub-systems.B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012TotalTitle: Paladin Integrated <strong>Management</strong> (PIM) DevelopmentArticles:126.150030.223096.146 - 96.146Description: Funding is provided for the following effortFY 2010 Accomplishments:Paladin Integrated <strong>Management</strong> (PIM) Development for integration of common components into prototypevehicles for testing to increase the reliability and maneuverability as well as reduce life cycle costs.FY 2011 Plans:Paladin Integrated <strong>Management</strong> (PIM) Development for integration of common components into prototypevehicles for testing to increase the reliability and maneuverability as well as reduce life cycle costs.FY 2012 Base Plans:Paladin Integrated <strong>Management</strong> (PIM) Development for integration of common components into prototypevehicles for testing to increase the reliability and maneuverability as well as reduce life cycle costs.Title: Test and EvaluationArticles:6.918011.674013.000 - 13.000Description: Funding is provided for the following effortFY 2010 Accomplishments:Test and Evaluation to include contractor testing and live-fire testing.FY 2011 Plans:UNCLASSIFIED<strong>Army</strong> Page 4 of 10 R-1 Line Item #120<strong>Volume</strong> <strong>5B</strong> - 364

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!