12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIEDExhibit R-3, RDT&E Project Cost Analysis: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)Test and Evaluation ($ in Millions)Cost Category Item<strong>Army</strong> Evaluation Center/Developmental TestCommand/Operational TestCommandModeling & Sim/JointInteroperability Test SptWhite Sands Missile Range(WSMR)ContractMethod& TypeTBDPerformingActivity & LocationVarious:VariousLocationsTotal PriorYearsCostCostR-1 ITEM NOMENCLATUREPE 0605457A: ARMY INTEGRATED AIR ANDMISSILE DEFENSE (AIAMD)FY 2011AwardDateCostFY 2012BaseAwardDateCostFY 2012OCOPROJECTS40: ARMY INTEGRATED AIR AND MISSILEDEFENSE (AIAMD)AwardDateFY 2012TotalCostCost ToCompleteTotal CostTargetValue ofContract- 0.811 0.894 - 0.894 Continuing Continuing ContinuingMIPR SED:Huntsville, AL - 16.061 15.818 - 15.818 Continuing Continuing ContinuingTBDWSMR:White Sands,NM- 0.125 2.518 - 2.518 Continuing Continuing ContinuingSubtotal - 16.997 19.230 - 19.230Total PriorYearsCost FY 2011FY 2012BaseFY 2012OCOFY 2012TotalProject Cost Totals - 251.124 270.607 - 270.607Cost ToCompleteTotal CostTargetValue ofContractRemarksUNCLASSIFIED<strong>Army</strong> Page 9 of 11 R-1 Line Item #128<strong>Volume</strong> <strong>5B</strong> - 480

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!