12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604805A: Command, Control,Communications Systems - Eng DevPROJECT593: JOINT BATTLE COMMAND - PLATFORM(JBC-P)B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012TotalComplete Software System Acceptance Test (SSAT) for product build 2 for Capability Set 13-14 softwareand deliver to PM. Complete engineering, design, development, coding and SSAT for Build 3 of productsoftware (vehicle, network operations center, command post, NETT Warrior products and incorporation ofMovement Tracking System functionality into JBC-P) for Capability Set 13-14 and deliver to PM. In order tomeet timelines for the <strong>Army</strong>'s Capability Set 15-16 fielding cycle, begin Software Development in Fiscal Year2012. Initiate engineering, design and coding for Capability Set 15-16 Core/Product Development Kit (PDK)software. Complete engineering, design and coding for product builds 4 through 6 to complete all threshold KeySystem Attributes and to fully meet the Key Performance Parameters outlined in the Capability DevelopmentDocument for all of the products. Continue development of functionality for aviation platforms, including workneeded for convergence of Ground and Air Command and Control (C2) and Situational Awareness (SA) and tosuccessfully complete DO178B airworthiness qualification testing. Conduct User Juries to gain user feedbackon the software. Include Marine Corps participation in working groups and integrated product/process teamsand provide software builds to the Marine Corps as required for testing to ensure Marine Corps requirements areincluded and adequately addressed throughout the software development effort.Title: Software EngineeringDescription: Perform Software/Systems Engineering in support of the development of JBC-P Capabilities,Applications, and Services, to include, but not limited to, Conducting Engineering Studies, ArchitectureDevelopment (both Software and Network), System Analyses, Technical Readiness Assessments, TechnicalInterchange Meetings/Events, and development of Related Reports and other deliverables.Articles:FY 2011 Plans:Perform Software/Systems Engineering in support of the development of JBC-P capabilities, Applications,and Services, to include, but not limited to, Conducting Engineering Studies, Architecture Development (bothSoftware and Network), System Analyses, Technical Readiness Assessments, Technical Interchange Meetings/Events, and development of Related Reports and other deliverables.FY 2012 Base Plans:In order to meet timelines for the <strong>Army</strong>'s Capability Set 15-16 fielding cycle, begin Software and SystemEngineering in Fiscal Year 2012. Begin planning, requirements analysis, system architecture and Family ofSystems (FoS) engineering for Capability Set 15-16 software. Begin security engineering including security- 20.000012.800 - 12.800UNCLASSIFIED<strong>Army</strong> Page 23 of 30 R-1 Line Item #110<strong>Volume</strong> <strong>5B</strong> - 186

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!