12.07.2015 Views

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

Volume 5B - Army Financial Management - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIEDExhibit R-2A, RDT&E Project Justification: PB 2012 <strong>Army</strong> DATE: February 2011APPROPRIATION/BUDGET ACTIVITY2040: Research, Development, Test & Evaluation, <strong>Army</strong>BA 5: Development & Demonstration (SDD)R-1 ITEM NOMENCLATUREPE 0604804A: Logistics and EngineerEquipment - Eng DevPROJECTH14: MATERIALS HANDLING EQUIPMENT -EDB. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012TotalFY 2010 Accomplishments:Engineering for Modification Work Orders required (based off testing)Accomplishments/Planned Programs Subtotals 0.074 0.955 1.056 - 1.056C. Other Program Funding Summary ($ in Millions)Line Item FY 2010 FY 2011FY 2012BaseFY 2012OCOFY 2012Total FY 2013 FY 2014 FY 2015 FY 2016Cost ToComplete Total Cost• OPA3, M41200: Rough Terrain 95.469 34.022 0.000 129.491Container Handler (RTCH)• OPA3, M41800: All Terrain Lifting 94.075 73.961 21.859 1.800 23.659 0.000 191.695<strong>Army</strong> System (ATLAS)• OPA3, G41002: Light CapacityRough Terrain (LCRT) Forklift12.936 10.944 10.944 5.595 9.489 25.230 Continuing ContinuingD. Acquisition StrategyRDT&E Engineering - Engineering efforts will be conducted: Programmatic Pre-Milestone C support of 5,000 LB Light Capacity Rough Terrain Forklift; Rough TerrainContainer Handler Crew Protection Kit Development; Rough Terrain Container Handler Crew Protection Kit Testing and Engineering Support at Aberdeen ProvingGrounds; Engineering for Modification Work Orders required (based off testing).E. Performance MetricsPerformance metrics used in the preparation of this justification material may be found in the FY 2010 <strong>Army</strong> Performance Budget Justification Book, dated May 2010.UNCLASSIFIED<strong>Army</strong> Page 27 of 86 R-1 Line Item #109<strong>Volume</strong> <strong>5B</strong> - 104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!