12.07.2015 Views

Transcript of Hearing 12/12/97 - TWA Flight 800 Investigation

Transcript of Hearing 12/12/97 - TWA Flight 800 Investigation

Transcript of Hearing 12/12/97 - TWA Flight 800 Investigation

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>12</strong>91<strong>12</strong>weighs 2,000 pounds.One question for Mr. Thomas.The Chairman3asked the question earlier on, what work Boeing has45done so far since the <strong>TWA</strong> accident.to that now?Could you respond6MR. THOMAS: Yes, certainly. I believe the7question was two-part,what service bulletins we had8published and what additional work is going on.As far9as service bulletins,there is a fuel pump conduit10service bulletin which is the inspection the FAA11mandated through an AD.That is in your docket, I<strong>12</strong>1314believe,bulletin,at this point.We have the scavenge pump connector servicewe have the series three terminal block that15we discussed at length.That is –– as we said, is due1617to be released in January/February <strong>of</strong> next year.We have the center wing tank inspection18bulletin which is also in the public docket.That was19202<strong>12</strong>2232425released in –– the updated revision is going to bereleased in January <strong>of</strong> ’98.Another one which is not connected directlywith <strong>TWA</strong> <strong>800</strong> is the override boost pump connectorinspection design improvement service bulletin wereleased simply because we had a connector problem. Ibelieve that is also in the docket.CAPITAL HILL REPORTING, INC.(202) 466-9500

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!