12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Persons manning plant entrance, liason with police, Fire tenders, Call<strong>for</strong> emergency vehicles, ambulance, to control traffic leaving P.H. toturn away visitors and non-essential vehicles.It is responsibility of EMM to identify such staff and <strong>for</strong>m task <strong>for</strong>ce tocarry out above activities.(v)Disaster Possibility in Hydro Power Stations• Disaster due to natural calamities such as floods, earthquake, windstorms which may affect outdoor installations, land slides.• Areas prone to disaster on account of fire are cable galleries,switchyard, switchgears.• Over speeding of turbines.• Failure of underground structures due to inadequate support orgeological reasons.• Following occurrence may cause flooding of P.S.a) Failure of top cover studs.b) Failure of Draft tube inspection window or near by liner plates.c) Entry of water from down stream side windows of P.S. duringfloods.d) Failure of diversion dam gates opening during floods and entryof water from upstream side in Dam Toe power station.Power station staff should remain always alert <strong>for</strong> such emergent eventualities.Power Station In-Charge should arrange drills, training <strong>for</strong> the staff at regularinterval specially be<strong>for</strong>e rainy season.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!