• Checking foundation bolts and nuts of valves & servomotor. Cleaning the bolts andnuts etc.• Checking servomotor piston and its collars & its gland packing• Checking hole of the servomotor cylinder• Checking the pins and bushes of servomotor & its air valve• Checking the diapharms in the opening & closing circuit. Checking the opening &closing times of the MIV.4.4.3 MAINTENANCE OF DRAFT TUBE GATESOne, two or three bulk head gates are needed to close off the draft tube. These areusually cable suspended gravity gates and designed <strong>for</strong> balanced pressure closure. These areusually dropped to close or lifted to open through hoisting arrangement having rope drums.The main problem with sealing is due to debris in bottom seal area. For withdrawal ofgate/ equalizing pressure across the gates is done with byepass line valve located with in gate.When machine are running these gates and hoist remains available <strong>for</strong> maintenance.These should always remain in perfect condition <strong>for</strong> use during emergencies of power station.During annual maintenance of the unit these gates are required to be lowered so thatdewatering of draft tube is possible. As such maintenance and overhaul of these gates aretaken up be<strong>for</strong>e starting annual maintenance of machine.Lubrication of operating mechanism, its electrical system and coating all ropes meant<strong>for</strong> lifting are of main concern <strong>for</strong> maintenance.4.5 PROCEDURES FOR TYPICAL MAINTENANCE ACTIVITIESFig 1 to 4, 10, 12 to 14 have been taken from “Hydropower Stations: Generating Equipment and itsinstallation” by AN Goncharov4.5.1 Reassembly of Vertical Hydro UnitSequence and Checks• Lower all guide vanes.• Trial assembly of Turbine runner <strong>for</strong> checking clearance between runner & runnerchamber (Kaplan) or static labyrinths & rotating labyrinths (Francis).• After setting above clearances take out runner & shaft assy. to service by.• Assemble runner, runner shaft and top cover and lower the complete assembly in pit.Again check clearances between runner and runner chamber. Also check freemovement of guide vanes. Check top and bottom clearances of all guide vanes andset.• Lower all the guide apparatus components in the pit and carry out installation &setting.• Lower bottom bracket with brake, set elevation, centering and tighten withfoundation.• Lower rotor with brake track in pit.• Carry out fitting & setting of Thrust bearing (and other guide bearings).<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!