12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl. No. Description Periodicity Remarksfrom rated speed after signaling the unitincreased abnormalto stop.then look <strong>for</strong>increased guide vanesclearances. Presenceof oil on brake trackor reduction in airpressure, defectivegauge etc.8.04 Check if excessive brake dust is generated Yearly Clean the affectedand find its cause.areas periodically as8.05 During jacking operation lifting of the rotoris to be limited to the specified value (7.0mm)8.06 Keep the unit on jacks which aremechanically locked during each shut-downof the unit8.07 After each jacking operation ensure cleaningof pipe with air under pressure as provided inthe system.8.08 Check no oil leaks from return line duringjacking operation8.09 Check function of the braking system onmanual & auto and the operation of the limitswitches of brake. Check leakage throughpipelines during braking / jacking.8.10 Check all fasteners of brakes and brake pipelines & gaskets wherever provided.8.11 Check the condition of brake track and itsholding with the rotor.8.12 Open brake cum jack assembly. Clean theinner surface of dust with Kerosene &reassemble.9.00 GENERALDuring jackingAs requiredAs requiredAs requiredYearlyYearlyYearlyYearly9.01 External examination of parts of generator Once in eachwhich are accessible.shift9.02 External inspection of air coolers, oil coolers, Once in eachpipe lines, sealing & control etc. <strong>for</strong> leakages. shift9.03 Ensure cleanliness of all external accessible Once in eachparts of the generator & wipe with clean & shiftdry cloth.9.04 Check wobbling of the shaft at turbine Dailygenerator flange/ TGB.9.05 Blow with compressed air the internal MonthlyrequiredLimit switch to besuitably mounted tocheck the rotor lift.Record be maintained.In case of anyproblem brake panel& brakes are to bechecked & rectified asrequired.Replace the gasket, ifrequired.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!