12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl. No. Description Periodicity Remarks10.06 Clean the oil pipe line after disconnecting it Yearly10.07 Check the operation of the valves of the pipe Yearlyline.10.08 Check the Operation of D.C. pump motor set Monthly(if provided)10.09 Remove sludge from oil tank. Monthly10.10 Check the temperature of cold & hot oil. Hourly Keep record in the logsheet.10.11 Check the air ventilation cock of the oil tankare open during operation of the unit.During start ofthe unit/ duringeach shift.10.12 Check pipe line <strong>for</strong> leakage of oil. Once in each10.13 Check oil sample <strong>for</strong> acidity, viscosity,moisture content, <strong>for</strong>eing material & sludge.Formations.10.14 Clean holes <strong>for</strong> oil entry into the T.B.housingshift.Once in 3monthsYearlySeparate oil samplefrom each bearingshould be sent <strong>for</strong>chemical analysis &record to be kept.All the above checks and some more checks are again tabulated <strong>for</strong> daily, weekly, monthlyand annual checks and maintenance.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!