12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

oFig 11: Checking Balancing of Generator• Draw to some scale a line ‘OA’ to represent reading of first run.Extend OA to ‘C’ such that OA = AC• With centre ‘O’ and radius equal to second run reading to the earlierscale draw an arc.• With centre ‘C’ and radius equal to third run reading to same scaledraw an arc to cut earlier arc at point ‘B’. Join AB.Balance weight ‘W’ = The angle of this weight is to be put with reference to 0 o position and isgiven by angle 0AB.• Whether this angle is to be measured in the direction of rotation oropposite to the direction of rotation is done by trial. The position whichgives minimum vibration is the required position. This is done byFourth run. For fourth run calculated weight at calculated angle is putand machine run at full speed if dial gauge reading is almost zero, theweight and direction is corrected otherwise the weight is required to beput in the opposite direction.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!