S.No.Item to beinspectedInspection ProcedureAction required ifunsatisfactory conditionindicatedApplicable <strong>for</strong>trans<strong>for</strong>mersApplicableUATS, SSTS anddistributiontrans<strong>for</strong>merswhen ticked √1 2 3 4 57. Gasket joints Check the tightness of Tighten the bolts evenly tobolts.avoid uneven pressure.8. Earth resistance Check earthing Take suitable action, if earthresistanceresistance is high.9. OLTC i) Diverter switch - Draw out diverter, cleanservicing& tighten contacts.ii) Check the contacts - Recondition/ replace, ifof diverter switch required.<strong>for</strong> burning orpitting marks.10. Bushing topconnectors andarcing horns11. Air bag sealingarrangementwhere provided.12. Cable boxes, ifprovided13. Lighteningarrestors14. Off circuit tapswitch15. Condenserbushingi) Check contactjoints.ii) Clean arcing hornsand check gap.i) Check healthinessof air bag.Check <strong>for</strong> sealingarrangement <strong>for</strong> fillingholes. Examinecompound <strong>for</strong> cracks.i) Examine <strong>for</strong> cracksand dirt deposits.ii) Measure IR valueof each stack of las.i) Move fromminimum tomaximum tapposition & return tominimum position.ii) Check resistancemeasurement ateach tap.Measure power factor/capacitancemeasurement.16. Electrical tests Carry outi) Resistancemeasurement at alltaps<strong>for</strong>trans<strong>for</strong>mers withoff circuit tap- Retighten.- Adjust arcing horn gap- Clean, if required.- Replace gaskets, ifleaking.- Replace compound, ifnecessary.- Clean or replace.- In case IR value is poor,replace.- Compare resistancevalues with previousresults. If resistance ishigh, tap switch contactsto be attended to.- Dryout bushing if valuesare abnormal and replaceoil if required.- Compare with previousvalues. Incase ofabnormality investigatecauses.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!