• While working on the breaker, its operating mechanism should be de-energized suchas discharging spring, releasing air pressure etc.• Trans<strong>for</strong>mer should be discharged and grounded from all sides (windings). Neutralgrounding of the trans<strong>for</strong>mer should not be treated as grounding.• Current trans<strong>for</strong>mer secondary should never to be left open circuited.• After cutting out capacitor bank, it should be allowed to discharge through dischargePT <strong>for</strong> about 10 minutes. The bank should be grounded with hot stick be<strong>for</strong>ecommencing the work.• ASKAREL compound used in capacitor bank as a dielectric is very toxic and harmful.Hence, should be handled with great care.• Apparatus, frame work and other non-current carrying metal parts associated withpower system are to be effectively grounded.• Lighting arresters shall be grounded independently.• Isolating switches provided <strong>for</strong> Generators and synchronous condensers and otherrotating machines should never be opened when connected to any voltage source evenwhen the machine is carrying no load.• The areas should be cordoned off indicating location of work on the particularequipment.• Use of safety tags must be ensured while allowing shut down <strong>for</strong> maintenance onsome part/ equipment.6.0 GUIDELINES FOR DOCUMENTATIONDocumentationDocumentation at all levels of work done is necessity <strong>for</strong> any references and analysisof data/in<strong>for</strong>mation in future as and when required.Roll of operation staff is very important in registering all valid in<strong>for</strong>mation operatingparameters such as temperature, vibrations pressure, generation, voltage current etc. in theoperation log books and shift registers.Every event should clearly mention frequency, voltage, MVAR, MW, MWH at theinstant with other necessary data e.g. alarms, annunciations temperatures, <strong>for</strong>ebaylevels/reservoir levels, inflows etc. as may be necessary from case to case.Any tripping event should be clearly noted with relevant details, such as relayoperation details, disturbance recorders and event logger print outs. Restoration activitiesafter every tripping should be reported with details of preventive action taken or to be takenbased on certain conditions. This in<strong>for</strong>mation should be presented in prescribed <strong>for</strong>mat,should be checked on daily basis by Engineer concerned who will check and authenticate thesame <strong>for</strong> future use.For maintenance also similar registers are maintained giving details of maintenanceactivities at different frequencies such as daily, monthly, annual etc. or break downmaintenance.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 78

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!