12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.2.3 Electrical• Air seal valve closed• Top cover drain system okey(b) Check levels:• Pressure accumulator (OPU)• Turbine Guide bearing• Lower Guide bearing• Upper Guide bearing• Thrust bearing(c) Check pressures:• Spiral casing• OPU• Stator cooling water pressure• Thrust bearing UGB, LGB• Sealing water pressure• Servo motor Pr. Gauge• Air pressure (brakes)(d) Check working of systems• Top cover drain• Oil leakage unit• Oil cooling unit• Oil pressure unit• Brakes• Position of CO 2 batteries• Guide vane lock on or off• Check jacking/dejacking of m/c• Check flow relays• Check emergency slide valve reset• Check working of ventilation system• D.C. System• Grid Power• DG Set power• Event logger• Disturbance loggerCheck list of Generator• Brake system• Cooling water <strong>for</strong> bearings• Generator fire fighting• AVR condition• DC supply <strong>for</strong> field flashing• Oil levels in bearings• IR values• Jack position• H.P. lubrication condition• Check earth link <strong>for</strong> bus duct<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!