12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Type Description of Log Purpose/used <strong>for</strong> Location/authorityemergency outages, maximum equipmenttemperatures during month, water utilized,rainfall, lake contents etc., plant loadfactor, availability factor etc. the data isimportant in studying plant per<strong>for</strong>manceover years.5. Daily report book(duplicate)6. Station waterconsumptionreport. Monthly(duplicate)7. Station occurrencerecord.8. Relay settingregister.9. Station operationmanual10. Station safetymanual11. DisastermanagementinstructionFor sending daily short summary to mainoffice of important events in plant. Shallgive rainfall, lake condition, waterutilized, water rate, generation, outages,tripping of lines etc., and any otheroperation related in<strong>for</strong>mation. DC batteryrelated voltage. Over loading of units etc.For mainly Hydro power plant, keepsrecords of daily/ monthly water discharge<strong>for</strong> generation, leakage, wind andevaporation losses <strong>for</strong> storage dams,meteorological and atmospheric data, atlake and at power house.Record of all tripping, loss of time, andcause of tripping, relay action etc.Record of all relay equipment relay settinggiving normal condition and during outageof trans<strong>for</strong>mer or line, record of allinstructions <strong>for</strong> revision. This is anextremely important register shall beavailable <strong>for</strong> reference at all times.Manual giving all step by step operationprocedure <strong>for</strong> outages etc. Giving allequipment data and equipment operatingparameter. Guidelines <strong>for</strong> emergencyoperation, black start procedure, startingand stopping of units, lake discharge andother hydraulic data, all mechanicalinstallation operating procedure anddrawings, station interlocking drawingsSafety procedure <strong>for</strong> giving outages, andtagging procedure. Use of tools, cranes,compressor, pumps etc. instructions givinguse of fire protections and fightingequipment. First Aid instructions.Gives details of instructions to be followedby shift staff during any disaster. It furthergives details of how to act and tackle thedisaster.Control room Residentengineer/ manageroperation/ shift chargeengineer.Control room. Residentengineer/ manageroperations. Head worksengineer.Shift charge engineer,manager operation.Manager operation/Resident engineerResident engineer,manager operations.Resident engineermanager operation,medical officer. Safetyofficer if appointedseparately.Resident engineer/ shiftinchargeSome sample <strong>for</strong>mats of log book and reports are also enclosed to provide a guide lineto create <strong>for</strong>mats <strong>for</strong> the power station under considerations:<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!