12.07.2015 Views

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

standards / manuals / guidelines for small hydro development - AHEC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Permission from nearest grid substation• Proper working of‣ Communication system‣ AC Power‣ DC Power‣ Firefighting system‣ Cooling water system‣ Drainage & dewatering system‣ H.S. lubrication system‣ L.P. & H.P. compressed air system‣ Protection system2.2.1 Check List <strong>for</strong> Starting of MachineThe staff responsible <strong>for</strong> the operation should be well conversant with technicaldetails and importance of following:-• Intake gates bye pass gates & <strong>for</strong>ebay• Inlet valves• Turbine• Generator• Generator Trans<strong>for</strong>mers• Switchyard• Synchronizing with grid• Closure of machine• Emergency closing of machine• Importance of log sheets2.2.2 MechanicalOn Intake• Check bye pass gate are not mechanically locked and all valves are in okeyposition• Check position of intake gate• Check position of stop log gates• Check filling line valve of penstock• Check supply to gates is O.K.Inside P.S.(i) Inlet valve:-• AC power <strong>for</strong> pump operation• HP compressed air• Locking pin position• Level and pressure in OPU(ii)Others:-(a) Check valves:• Check spiral drain valve is closed• Check D.T. drain valve is closed• Position of stainer valves ensure water flowing in cooling pipes• Gland seal valve open<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!