i) Desembly, inspection, cleaning, measurement of clearances, polishing ofguide pads, centering of shaft, reassembly, setting of clearances, filling of oilsump with filtered water.ii) Check the temperature sensing device, if necessary, replace with new ones.2. Gland Seals and Isolating Air Inflated Seals:Dessembly, inspection, cleaning and reassembly. Replacing of worn out rubber flapsor carbon segments, if necessary.3. Clean Water System:Clean water pipes are dismantled, cleaned, reassembled with new gasket all the valvesare attended <strong>for</strong> any leakage etc.4. Guide Vane Servomotor:Dismentling <strong>for</strong> inspection and cleaning. Reassembling and replacing the seals withnew ones, if necessary.5. Guide Vanes Bush Housing :i) Removing, cleaning and inspecting <strong>for</strong> wear and tear replacing with new onesif found necessary. Replace seals, if necessary.ii) Guide vanes are reconditioned.6. Governor:i) Cleaning and checking OPU pumps. Replace bushes, bearings etc. if foundworn out. Also attend pump motors.ii) Cleaning OPU sump and pressure accumulator and refill with filtered oil.iii) Attend oil pipeline flanges and valves <strong>for</strong> leakages.iv) Check setting of pressure switches installed <strong>for</strong> Auto operation <strong>for</strong> opu pumps.v) Attend Governor Mechanical cabinet <strong>for</strong> leakages, loose links. Clean main andpilot slide valves. Set Auto rod as per designs Alpha Beta setting may also bechecked in case of Kaplan turbine.vi) Check electrical circuit. Tightening of all the connections should be done.7. Under Water Partsi) Inspect condition of welded seams of penstock spiral crossing and draft tubesrectify defects by welding and grinding. Penstock filling line valve should alsobe checked and repaired.ii) Cleaning and painting of penstock, spiral casing and draft tube liner.iii) Overhauling of spiral drain valve and draft tube drain valve.8. Runneri) Dewatering of draft tube and fabrication of plat<strong>for</strong>m in the draft tube <strong>for</strong>inspection of runner.ii) If it is a Kaplan Runner test the same after applying full governor pressure <strong>for</strong>leakage of oil.iii)iv)Replace blade seals if necessary.Inspect blades of the runner and make up profile of the blades by welding.Due to erosion, abrasion and cavitations, material of the blade washes awaywith passage of time. After weld repair heat treatment and dynamic balacing ismust be<strong>for</strong>e installation.<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!