(b)(c)there is a minimum contact of the trans<strong>for</strong>mer core and windings with the atmospheric air.Similarly drain oil from cooling circuit and radiators and fill dry clean oil.Whenever trans<strong>for</strong>mer windings are to be taken out due to any reason such as to repair adamage, thorough washing due to sludge <strong>for</strong>mation or <strong>for</strong> thorough inspection to locate afault as a result of DGA or some other tests, after carrying out the necessary work <strong>for</strong> whichthe trans<strong>for</strong>mer was opened, do the following also:(i) Tighten all coil clamping screws to remove looseness from the windings, if any.(ii) Tighten all nuts and bolts whether metallic or made of insulating material onmechanical and electrical joints.(iii) Tighten core yoke bolts, core-clamping screws etc.Under the normal operating condition trans<strong>for</strong>mer has an useful life of about 25-30 years.This may vary considerably depending upon the overloads it has carried and the temperatureat which it has worked during its span of operation. There<strong>for</strong>e <strong>for</strong> any future planning it maybe worth while to know well in advance the remanent life of the trans<strong>for</strong>mer in service. Thiscan be done by assessing extent of degradation of cellulosic paper through furan content intrans<strong>for</strong>mer oil or / and degree of polymerization (DP) of paper. It is proposed to carry outthis study after a period of 20 years of service. After knowing the remanent life in atrans<strong>for</strong>mer, the action can be planned in conjunction with life assessment studies ongenerating unit.As these are comparatively new studies, the data are still being built and one should go by there-commendation of the Test Laboratory. However the following figures may serve as<strong>guidelines</strong>.Degree ofFuran contentPolymerizationppm (mg/kg)New trans<strong>for</strong>mer 800-950 NegligibleNearing end of life 150-200 10<strong>AHEC</strong>/MNRE/SHP Standards/ E&M Works – Guidelines <strong>for</strong> Operation and Maintenance of Small Hydropower Station 51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!