13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>no requirement to post financial assurance to secure site restoration costs in Chile atpresent.The increased reserves will result in <strong>the</strong> need to permit additional leach pad capacity but thisis not considered to be a risk, as <strong>the</strong> existing permitted space is sufficient <strong>for</strong> <strong>the</strong> majority of<strong>the</strong> remaining reserves.23.6 Capital CostsCapital requirements were defined based on a mine life of 16 years utilizing <strong>the</strong> SARTprocess in future years. The capital costs critical items include construction costs <strong>for</strong> <strong>the</strong>SART process facility, sustaining capital <strong>for</strong> continued expansion of <strong>the</strong> existing leach padand partial replacement of <strong>the</strong> mining fleet in year 2015. The breakdown of costs wasestablished by activity area. They are reported in three main categories: mining, processingand o<strong>the</strong>rs. The costs associated with upgrading some existing equipment in 2008 report to<strong>the</strong> O<strong>the</strong>r category. The schedule of capital costs is presented in Table 23-1.Table 23-1: Capital Costs – <strong>Maricunga</strong>2008 2009 2010 2011 2012 2013 2014 2015 2016 2017MiningStrippingProjectconstructionEquipment 1,900 7,200 13,290 10,650 2,050 13,530 28,900 1,500 4,300Sustaining 10,233 3,227 10,965 841 755 473 325 583 341 855O<strong>the</strong>rSubtotal 12,133 10,427 24,255 11,491 2,805 473 13,855 29,483 1,841 5,155ProcessingProjectConstruction 8,000 2,000 29,387 24,926 5,000 3,000 3,500 3,500 3,500 3,500EquipmentSustaining 1,000 500 500SART 539 19,704Subtotal 8,539 22,704 29,387 24,926 5,000 3,500 3,500 3,500 3,500 4,000O<strong>the</strong>rProjectConstructionEquipmentSustaining 14,879 -13,916O<strong>the</strong>rSubtotal 14,879 -13,916CapitalCosts 35,551 19,215 53,642 36,417 7,805 3,973 17,355 32,983 5,341 9,155108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!