13.07.2015 Views

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

Technical Report for the Maricunga Gold Mine - Kinross Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kinross</strong> <strong>Gold</strong> Corporation<strong>Maricunga</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>In September 2002, in response to rising gold prices, Compañia <strong>Mine</strong>ra <strong>Maricunga</strong> (CMM)approved an Exploration Program designed to increase <strong>the</strong> reserve base of <strong>the</strong> <strong>Maricunga</strong>Project to a level sufficient to support resumption of active mining. The drilling completed in2002-2003 focused largely on definition drilling <strong>for</strong> a $350 gold pit design.The exploration program ran from September 2002 to June 2003. During this period, a totalof 262 drill holes (51,478 meters) of drilling were completed. The drilling focused onincreasing <strong>the</strong> confidence level of <strong>the</strong> known mineralization below <strong>the</strong> current Verde pits aswell as increasing <strong>the</strong> confidence level in <strong>the</strong> mineralization at <strong>the</strong> nearby Pancho deposit,located approximately 2.0 km to <strong>the</strong> nor<strong>the</strong>ast. Much of <strong>the</strong> 2002 – 2003 drilling wasdiamond drill core, allowing geologists an opportunity to clearly delineate geological andalteration features affecting gold mineralization and recovery.The in<strong>for</strong>mation was compiled and incorporated in new mineral resource and mineralreserve estimates <strong>for</strong> Verde and Pancho. The reserves <strong>for</strong>med <strong>the</strong> basis of a detailedengineering study examining <strong>the</strong> economics of <strong>the</strong> project assuming a capital investment of$101.1 million to upgrade <strong>the</strong> existing infrastructure, allowing <strong>the</strong> plant to process 40,000tonnes per day of Verde ore and 35,000 tonnes per day of Pancho ore. The capitalinvestment was based on preliminary design and first-principle engineering.The <strong>Maricunga</strong> <strong>Mine</strong> resumed full production in October 2005 at a mining rate of 40,000 tpd.Total production of 233,000 ounces from 14,333,000 tonnes at 0.74 g/t Au is reported <strong>for</strong>2007. Only data below <strong>the</strong> year-end 2007 topographic surface was used to complete <strong>the</strong>new resource model and reserve estimate.Both <strong>the</strong> 2002-2003 and 2006 drill programs were carefully supervised, employing industrybest practices and rigid quality management procedures in <strong>the</strong> collection and managementof <strong>the</strong> field data. In addition, all historic data <strong>for</strong> <strong>the</strong> project was subjected to detailedverification programs where <strong>the</strong> data in <strong>the</strong> relational database was verified against originallogs, survey calculation sheets and original assay certificates. The result is a duly verifieddatabase containing data of high quality and free of gross errors and omissions. Thisdatabase was <strong>the</strong>n used to estimate mineral resource and reserves <strong>for</strong> <strong>the</strong> project.In early 2006, CMM made <strong>the</strong> decision to drill at Pancho to better define <strong>the</strong> mineralresource both laterally and at depth. During <strong>the</strong> course of 2007, a full review of <strong>the</strong> geologic12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!